TIME-STEPPED, SIMULATION-BASED SCHEDULING SYSTEM FOR LARGE-SCALE INDUSTRIAL CONSTRUCTION PROJECTS

被引:0
作者
Hu, Di [1 ]
Mohamed, Yasser [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Hole Sch Construct Engn & Management, Markin CNRL Nat Resources Engn Facil, Edmonton, AB T6G 2W2, Canada
来源
2013 WINTER SIMULATION CONFERENCE (WSC) | 2013年
关键词
OPTIMIZATION; SPACE; MODEL;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Industrial construction projects have recently moved more towards tighter schedules and fast-tracked engineering and construction. This leads to overlap between work packages, increased occurrences of resource over-allocation and site congestion, which pose challenges to project planners in scheduling construction works and dynamically allocating resources considering the construction site conditions. Most previous research related to scheduling and resource allocation assumes that allocated resources remain consistent throughout the execution of work packages. This paper presents a workface planning system that allows for variable resource allocation and variable durations in execution of a work package, while holding logic relationships and space congestion constraints. A case study from a real industrial project is presented and results show that the proposed system reduces resource idle time as well as returns shorter project duration than traditional scheduling approaches.
引用
收藏
页码:3249 / 3256
页数:8
相关论文
共 50 条
  • [41] Simulation-based machine shop operations scheduling system for energy cost reduction
    Kim, Sojung
    Meng, Chao
    Son, Young Jun
    SIMULATION MODELLING PRACTICE AND THEORY, 2017, 77 : 68 - 83
  • [42] Simulation based programming for optimization of large-scale rainwater harvesting system: Malaysia case study
    Hashim, H.
    Hudzori, A.
    Yusop, Z.
    Ho, W. S.
    RESOURCES CONSERVATION AND RECYCLING, 2013, 80 : 1 - 9
  • [43] A biogeography-based optimization algorithm with modified migration operator for large-scale distributed scheduling with transportation time
    Zhang, Yaya
    Gu, Xingsheng
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 231
  • [44] A simulation-based decision support system for industrial field service network planning
    Hertz, Philipp
    Cavalieri, Sergio
    Finke, Gandolf R.
    Duchi, Aldo
    Schoensleben, Paul
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2014, 90 (01): : 69 - 84
  • [45] A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system
    Lusby, Richard
    Muller, Laurent Flindt
    Petersen, Bjorn
    JOURNAL OF SCHEDULING, 2013, 16 (06) : 605 - 628
  • [46] An interactive risk visualisation tool for large-scale and complex engineering and construction projects under uncertainty and interdependence
    Kimiagari, Salman
    Keivanpour, Samira
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (21) : 6827 - 6855
  • [47] PRODUCTION-DISTRIBUTION PLANNING OF CONSTRUCTION SUPPLY CHAIN MANAGEMENT UNDER FUZZY RANDOM ENVIRONMENT FOR LARGE-SCALE CONSTRUCTION PROJECTS
    Xu, Jiuping
    Wei, Pei
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2013, 9 (01) : 31 - 56
  • [48] Accelerated Metabolic Engineering for Industrial Strain Development via the Construction of a Large-Scale Genome Library
    Dong, Yufei
    Chen, Zhen
    ACS SYNTHETIC BIOLOGY, 2024, : 41 - 56
  • [49] Outlet design optimization based on large-scale nonsmooth DEM simulation
    Wang, D.
    Servin, M.
    Mickelsson, K. -O
    POWDER TECHNOLOGY, 2014, 253 : 438 - 443
  • [50] Fast Simulation of Large-Scale Floods Based on GPU Parallel Computing
    Liu, Qiang
    Qin, Yi
    Li, Guodong
    WATER, 2018, 10 (05):