TIME-STEPPED, SIMULATION-BASED SCHEDULING SYSTEM FOR LARGE-SCALE INDUSTRIAL CONSTRUCTION PROJECTS

被引:0
作者
Hu, Di [1 ]
Mohamed, Yasser [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Hole Sch Construct Engn & Management, Markin CNRL Nat Resources Engn Facil, Edmonton, AB T6G 2W2, Canada
来源
2013 WINTER SIMULATION CONFERENCE (WSC) | 2013年
关键词
OPTIMIZATION; SPACE; MODEL;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Industrial construction projects have recently moved more towards tighter schedules and fast-tracked engineering and construction. This leads to overlap between work packages, increased occurrences of resource over-allocation and site congestion, which pose challenges to project planners in scheduling construction works and dynamically allocating resources considering the construction site conditions. Most previous research related to scheduling and resource allocation assumes that allocated resources remain consistent throughout the execution of work packages. This paper presents a workface planning system that allows for variable resource allocation and variable durations in execution of a work package, while holding logic relationships and space congestion constraints. A case study from a real industrial project is presented and results show that the proposed system reduces resource idle time as well as returns shorter project duration than traditional scheduling approaches.
引用
收藏
页码:3249 / 3256
页数:8
相关论文
共 50 条
  • [21] The Research on scheduling of large-scale reverse osmosis desalination system
    Niu, Zhiyuan
    Ding, Qiang
    Wang, Jian
    Jiang, Aipeng
    Shu Jiangzhou
    [J]. 2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2443 - 2449
  • [22] Gap-based transit assignment algorithm with vehicle capacity constraints: Simulation-based implementation and large-scale application
    Verbas, Omer
    Mahmassani, Hani S.
    Hyland, Michael F.
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2016, 93 : 1 - 16
  • [23] Integrating Construction Operation and Context in Large-Scale Construction Using Hybrid Computer Simulation
    Lee, SangHyun
    Han, Sangwon
    Pena-Mora, Feniosky
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (02) : 75 - 83
  • [24] Dynamic management system of large-scale water conservancy project construction based on ArcGIS
    Wang, Zhenghong
    Zhang, Peng
    Shen, Wennian
    [J]. INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
  • [25] A Simulation-Based Optimization Approach for Assessing Sustainability in a Multi-construction Projects Environment
    Zaki, Areej M.
    Abdelsalam, Hisham M.
    El-Khodary, Ihab A.
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT SYSTEMS AND INFORMATICS 2018, 2019, 845 : 556 - 566
  • [26] A simulation-based approach to optimizing resource allocation and logistics in construction projects: a case study
    Nikoukar, Shayan
    Tavakolan, Mehdi
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [27] Mountain railway alignment optimization integrating layouts of large-scale auxiliary construction projects
    Song, Taoran
    Pu, Hao
    Schonfeld, Paul
    Liang, Zhu
    Zhang, Ming
    Hu, Jianping
    Zhou, Yuhui
    Xu, Zhanjun
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2023, 38 (04) : 433 - 453
  • [28] Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building
    Lu, Xing
    Adetola, Veronica A.
    Bhattacharya, Saptarshi
    [J]. ENERGY AND BUILDINGS, 2024, 316
  • [29] A simulation-based framework for checkpoint design in large-scale crowd management: Case study of the papal mass in philadelphia
    Aros-Vera, Felipe
    Sadeghi, Azadeh
    Sinaki, Roohollah Younes
    Sormaz, Dusan
    [J]. SAFETY SCIENCE, 2020, 127
  • [30] Partitioning and solving large-scale tactical harvest scheduling problems for industrial plantation forests
    Bellavenutte, Pedro
    Chung, Woodam
    Diaz-Balteiro, Luis
    [J]. CANADIAN JOURNAL OF FOREST RESEARCH, 2020, 50 (08) : 811 - 818