TIME-STEPPED, SIMULATION-BASED SCHEDULING SYSTEM FOR LARGE-SCALE INDUSTRIAL CONSTRUCTION PROJECTS

被引:0
|
作者
Hu, Di [1 ]
Mohamed, Yasser [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Hole Sch Construct Engn & Management, Markin CNRL Nat Resources Engn Facil, Edmonton, AB T6G 2W2, Canada
来源
2013 WINTER SIMULATION CONFERENCE (WSC) | 2013年
关键词
OPTIMIZATION; SPACE; MODEL;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Industrial construction projects have recently moved more towards tighter schedules and fast-tracked engineering and construction. This leads to overlap between work packages, increased occurrences of resource over-allocation and site congestion, which pose challenges to project planners in scheduling construction works and dynamically allocating resources considering the construction site conditions. Most previous research related to scheduling and resource allocation assumes that allocated resources remain consistent throughout the execution of work packages. This paper presents a workface planning system that allows for variable resource allocation and variable durations in execution of a work package, while holding logic relationships and space congestion constraints. A case study from a real industrial project is presented and results show that the proposed system reduces resource idle time as well as returns shorter project duration than traditional scheduling approaches.
引用
收藏
页码:3249 / 3256
页数:8
相关论文
共 50 条
  • [11] Study on Construction of Industrial Large-Scale Battery System
    Yamauchi, Shin
    Emori, Akihiko
    Futami, Motoo
    Kawai, Michifumi
    Honda, Mitsutoshi
    Takeda, Kenji
    Iwasawa, Hiroshi
    ELECTRICAL ENGINEERING IN JAPAN, 2017, 198 (02) : 50 - 58
  • [12] Emergency Management of Large-Scale Construction Projects Based on Metadata
    Xu, Shengdeng
    PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 865 - 875
  • [13] Agent-Based Simulation Framework for Supply Chain Management of Large-Scale Construction Projects
    Jung, Minhyuk
    COMPUTING IN CIVIL ENGINEERING 2017: SENSING, SIMULATION, AND VISUALIZATION, 2017, : 289 - 296
  • [14] A Simulation-based Linearity Study of Large-scale Power Systems
    Bai, Feifei
    Liu, Yong
    Liu, Yilu
    Wang, Xiaoru
    2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [15] LARGE-SCALE SIMULATION-BASED OPTIMIZATION OF SEMICONDUCTOR DISPATCHING RULES
    Hildebrandt, Torsten
    Goswami, Debkalpa
    Freitag, Michael
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2580 - 2590
  • [16] Efficient Simulation-Based Toll Optimization for Large-Scale Networks
    Osorio, Carolina
    Atasoy, Bilge
    TRANSPORTATION SCIENCE, 2021, 55 (05) : 1010 - 1024
  • [17] A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks
    Camilo Paz, Juan
    Rozenboim, David
    Cuadros, Alvaro
    Cano, Sandra
    Willmer Escobar, John
    CONSTRUCTION ECONOMICS AND BUILDING, 2018, 18 (02): : 41 - 69
  • [18] Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works
    Li, Rui
    Roberti, Roberto
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (06)
  • [19] Research on the Information Management System Design of Large-scale Construction Projects
    Liang, Jun
    Ding, Yunlong
    PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 439 - 445
  • [20] The Integrated Management in the Large-Scale Projects' Construction
    Liu, Yisheng
    Bao, Lijia
    Chen, Xu
    LISS 2013, 2015, : 329 - 334