Life cycle cost for technology selection: A Case study in the manufacturing of injection moulds

被引:33
作者
Folgado, R. [1 ]
Pecas, P. [1 ]
Henriques, E. [1 ]
机构
[1] Univ Tecn Lisboa, Inst Super Tecn, IDMEC, P-1049001 Lisbon, Portugal
关键词
Life cycle cost; Plastic injection moulds; Low production moulds; Spray metal moulds; Technology selection;
D O I
10.1016/j.ijpe.2010.07.036
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During mould design phase different approaches are envisaged to materialize part production and they must be evaluated not only in technological criteria, but also in an economical perspective. However, the comparison of such alternative approaches is not always evident for the mould designer. The solution proposed in this paper, based on the development of a life cycle cost model, fosters its application as a methodology to compare two mould manufacturing alternatives: a spray metal shell mould backfilled with a resin and aluminium powder resin and a conventional machined aluminium mould. A better mould or a better alternative is the one that incurs in fewer life cycle costs, assuming that the injected part is produced within a conformed quality. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:368 / 378
页数:11
相关论文
共 32 条
  • [21] PECAS P, 2004, P RPD 2004 RAP PROD
  • [22] Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts
    Qian, Li
    Ben-Arieh, David
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (02) : 805 - 818
  • [23] Modeling process-switching decisions under product life cycle uncertainty
    Ramasesh, Ranga
    Tirupati, Devanath
    Vaitsos, Constantin A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 236 - 246
  • [24] Life cycle engineering methodology applied to material selection, a fender case study
    Ribeiro, Ines
    Pecas, Paulo
    Silva, Arlindo
    Henriques, Elsa
    [J]. JOURNAL OF CLEANER PRODUCTION, 2008, 16 (17) : 1887 - 1899
  • [25] Rapid tooling: the state of the art
    Rosochowski, A
    Matuszak, A
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2000, 106 (1-3) : 191 - 198
  • [26] SACCARDI D, 2004, METODOLOGIA LIFE CYC
  • [27] Planned lead time determination in a make-to-order remanufacturing system
    Tang, Ou
    Grubbstrom, Robert W.
    Zanoni, Simone
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 108 (1-2) : 426 - 435
  • [28] *US DOE, 1997, LIF CYCL COST EST, pCH23
  • [29] Walls J., 1998, Interim Technical Bulletin
  • [30] WILLIAMS B, 2002, ANTEC C 2002 P SAN F, V3, P3470