共 25 条
[2]
ALFAWZAN MA, 1996, P 20 INT C COMP IND
[3]
OPTIMAL PRODUCTION PLAN IN A TOOL WEAR PROCESS WITH REWARDS FOR ACCEPTABLE, UNDERSIZED AND OVERSIZED PARTS
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1987, 11 (01)
:13-19
[7]
Baxter L. A., 1987, PROBAB ENG INFORM SC, V1, P405
[8]
BAZAARA MS, 1993, NONLINEAR PROGRAMMIN
[10]
GIBRA IN, 1967, J IND ENGINEERING, V18, P35