A New Multiattribute Decision Making Support Tool for Identifying Critical Components in Power Transmission Systems

被引:27
作者
Gharakheili, Masoud Asghari [1 ]
Fotuhi-Firuzabad, Mahmud [2 ]
Dehghanian, Payman [3 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Elect Engn, Tehran 1477893855, Iran
[2] Sharif Univ Technol, Dept Elect Engn, Ctr Excellence Power Syst Management & Control, Tehran 1136511155, Iran
[3] Texas A&M Univ, Dept Elect & Comp Engn, College Stn, TX 77843 USA
来源
IEEE SYSTEMS JOURNAL | 2018年 / 12卷 / 01期
关键词
Analytical hierarchical process (AHP); asset management; critical component; decision making; reliability-centered maintenance (RCM); transmission system; RELIABILITY-CENTERED MAINTENANCE; COMPREHENSIVE SCHEME; ASSET MANAGEMENT; OPTIMIZATION; CRITERIA;
D O I
10.1109/JSYST.2015.2500262
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The present context of the electric industry, characterized by competitive markets, privatization, and regulatory of technical requirements forces the power utilities to optimize their asset management practices and develop the requisite decision plans techno-economically. Practically approaching, this paper devises a new support tool based on a multiattribute decision making (MADM) framework in combination with analytical hierarchical process (AHP) to determine the most critical components of power transmission systems. Measure of system-wide reliability performance, outage cost, marginal clearing prices demonstrative of market fairness, and network losses are among the attributes considered in this paper for component criticality assessment. With the frequent existence of qualitative and quantitative attributes, the proposed approach can effectively help to deal with the existent uncertainty and conventional judgment vagueness. As verified in a case study on the IEEE Reliability Test System (IEEE-RTS), the proposed framework introduces its applicability and efficiency for the practical asset management optimizations in electric utilities.
引用
收藏
页码:316 / 327
页数:12
相关论文
共 43 条
[1]   An Efficient Mixed-Integer Linear Formulation for Long-Term Overhead Lines Maintenance Scheduling in Power Distribution Systems [J].
Abiri-Jahromi, A. ;
Fotuhi-Firuzabad, M. ;
Abbasi, E. .
IEEE TRANSACTIONS ON POWER DELIVERY, 2009, 24 (04) :2043-2053
[2]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[3]  
[Anonymous], THESIS
[4]  
[Anonymous], 2005, APPL FUZZY ARITHMETI
[5]   DDM - DECISION-SUPPORT SYSTEM FOR HIERARCHICAL DYNAMIC DECISION-MAKING [J].
BADIRU, AB ;
PULAT, PS ;
KANG, M .
DECISION SUPPORT SYSTEMS, 1993, 10 (01) :1-18
[6]   Reliability Centered Maintenance for transmission systems [J].
Beehler, ME .
IEEE TRANSACTIONS ON POWER DELIVERY, 1997, 12 (02) :1023-1028
[7]   A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems [J].
Bertling, L ;
Allan, R ;
Eriksson, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) :75-82
[8]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[9]   MULTI-CRITERIA DECISION-ANALYSIS WITH FUZZY PAIRWISE COMPARISONS [J].
BOENDER, CGE ;
DEGRAAN, JG ;
LOOTSMA, FA .
FUZZY SETS AND SYSTEMS, 1989, 29 (02) :133-143
[10]  
Chan T, 2005, IEEE POWER ENG SOC, P684