An improved integrated maintenance/spare parts management for wind turbine systems with adopting switching concept

被引:2
作者
Abderrahmane, F. [1 ]
Bouslikhane, S. [2 ]
Hajej, Z. [1 ]
Dellagi, S. [1 ]
Trabelsi, W. [3 ]
机构
[1] Univ Lorraine, Metz, France
[2] Universiapolis, Elect Engn Dept, Agadir, Morocco
[3] ICN Business Sch, Nancy, France
关键词
Maintenance strategy; Wind turbine; Renewable energy production; Preventive maintenance; Optimization; SPARE PARTS; PREVENTIVE MAINTENANCE; JOINT OPTIMIZATION; PERFORMANCE; ELECTRICITY; FARM;
D O I
10.1016/j.egyr.2022.07.123
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this work, we address an optimized integrated maintenance strategy and spare parts management problem for wind turbine system, with an observable level of degradation. The purpose of the study consists in establishing an improved maintenance strategy integrating a spare parts policy, according random production of energy over a given period. The wind turbine system failure rate is being modeled as a function of the current operating mode. Therefore, an improved maintenance strategy, characterized by a switching between both perfect and imperfect preventive maintenance actions, is developed and optimized. Formally, our objective is realized by the optimization of a total cost integrating maintenance action and spare parts management over a finite planning horizon, with considering the impact of the production rate on wind turbine system failure rate. A numerical study is realized in order to proof the robustness of the analytical model developed. (C) 2022 Published by Elsevier Ltd.
引用
收藏
页码:936 / 955
页数:20
相关论文
共 37 条
  • [1] Measuring operational excellence: an operational excellence profitability (OEP) approach
    Alejandro Golcher-Barguil, Luis
    Nadeem, Simon Peter
    Garza-Reyes, Jose Arturo
    [J]. PRODUCTION PLANNING & CONTROL, 2019, 30 (08) : 682 - 698
  • [2] A novel approach for modelling complex maintenance systems using discrete event simulation
    Alrabghi, Abdullah
    Tiwari, Ashutosh
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2016, 154 : 160 - 170
  • [3] Performance of spare parts supply chains in developing industries
    Alsaleh, Naser Abdulrahman
    [J]. PRODUCTION PLANNING & CONTROL, 2017, 28 (10) : 860 - 872
  • [4] Production Planning and Opportunistic Preventive Maintenance for Unreliable One-Machine Two-Products Manufacturing Systems
    Assid, M.
    Gharbi, A.
    Hajji, A.
    [J]. IFAC PAPERSONLINE, 2015, 48 (03): : 484 - 489
  • [5] Spare-part management in a heterogeneous environment
    Barabadi, Reza
    Ataei, Mohammad
    Khalokakaie, Reza
    Qarahasanlou, Ali Nouri
    [J]. PLOS ONE, 2021, 16 (03):
  • [6] Wind Power Electricity: The Bigger the Turbine, The Greener the Electricity?
    Caduff, Marloes
    Huijbregts, Mark A. J.
    Althaus, Hans-Joerg
    Koehler, Annette
    Hellweg, Stefanie
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2012, 46 (09) : 4725 - 4733
  • [7] Onshore wind farms maintenance optimization using a stochastic model
    Carlos, S.
    Sanchez, A.
    Martorell, S.
    Marton, I.
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2013, 57 (7-8) : 1884 - 1890
  • [8] Failure rate, repair time and unscheduled O&M cost analysis of offshore wind turbines
    Carroll, James
    McDonald, Alasdair
    McMillan, David
    [J]. WIND ENERGY, 2016, 19 (06) : 1107 - 1119
  • [9] Preventive maintenance model analysis on wind-turbine gearbox under stochastic disturbance
    Chen, Li
    Su, Hongsheng
    Huangfu, Lanlan
    [J]. ENERGY REPORTS, 2022, 8 : 224 - 231
  • [10] Integrated maintenance/spare parts management for manufacturing system according to variable production rate impacting the system degradation
    Dellagi, Sofiene
    Trabelsi, Wajdi
    Hajej, Zied
    Rezg, Nidhal
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2020, 28 (01): : 72 - 84