Building Information Modeling enabled Cascading Formwork Management Tool

被引:30
作者
Mansuri, Dolly [1 ]
Chakraborty, Debaditya [1 ]
Elzarka, Hazem [1 ]
Deshpande, Abhijeet [1 ]
Gronseth, Trevor [2 ]
机构
[1] Univ Cincinnati, Coll Engn & Appl Sci, POB 210071, Cincinnati, OH 45221 USA
[2] Baker Concrete Construct, 990 North Main St, Monroe, OH 45050 USA
关键词
Building information modeling; Formwork management; Cascading algorithm; SELECTION; CONSTRUCTION; SYSTEM; BIM; PRODUCTIVITY; DESIGN;
D O I
10.1016/j.autcon.2017.08.016
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Formwork systems are accountable for a significant share of the cost of reinforced concrete structures. The application of constructability principles to the design, selection and management of formwork systems in the preconstruction phase can significantly reduce the cost of reinforced concrete construction projects. Although many studies have developed tools and methodologies to automate the design and selection of formwork systems, few studies have explored the benefits of improving the process of managing formwork. The focus of this paper is on the use of BIM along with a cascading tool to maximize the return on formwork investment and improve the management of formwork. This paper presents an approach to utilize data drawn from the building information models coupled with a cascading algorithm to efficiently manage the formwork inventory on a construction project by generating a scheduled formwork reuse plan and calculating the minimum quantity of formwork required for the project. The paper discusses the use of BIM to extract data required for the cascading tool, working of the cascading algorithm and the development of the tool. The paper ends by presenting a case study where the developed tool was applied on a construction project in Cincinnati, Ohio and 13% savings in formwork material cost was reported.
引用
收藏
页码:259 / 272
页数:14
相关论文
共 37 条
[11]  
Goucher D., 2012, 49 ASC ANN INT C CAL
[12]  
Halpin D.W., 1992, PLANNING ANAL CONSTR
[13]   NEUROSLAB - NEURAL-NETWORK SYSTEM FOR HORIZONTAL FORMWORK SELECTION [J].
HANNA, AS ;
SENOUCI, AB .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1995, 22 (04) :785-792
[14]   KNOWLEDGE ACQUISITION AND DEVELOPMENT FOR FORMWORK SELECTION SYSTEM [J].
HANNA, AS ;
WILLENBROCK, JH ;
SANVIDO, VE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01) :179-198
[15]  
Haque M.E., 2004, ASEE ANN C SALT LAK, V27
[16]  
Hardin B., 2009, BIM CONSTRUCTION MAN, V7
[17]   Planning gang formwork operations for building construction using simulations [J].
Huang, RY ;
Chen, JJ ;
Sun, KS .
AUTOMATION IN CONSTRUCTION, 2004, 13 (06) :765-779
[18]  
Hurd M.K., 1995, FORMWORK CONCRETE
[19]   Buildability factors affecting formwork labour productivity of building floors [J].
Jarkas, Abdulaziz M. .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (10) :1383-1394
[20]  
Kamarthi S., 1992, J.Comput.Civ.Eng, V6, P178, DOI [DOI 10.1061/(ASCE)0887-3801(1992)6:2(178), 10.1061/(ASCE)0887-3801(1992)6]