The integration of Renewable Energies (RE) into the existing energy supply system has proven to very challenging due to the fluctuating nature of RE ressources. However, the negative environmental impacts of power generation can be significantly reduced by limiting the share of fossil fuels used in energy production. As a result wind and photovoltaic capacity in the synchronous grid of continental Europe (UCTE) is increasing. Thus both the European Union and Germany have set ambitious goals for the future growth of RE. The objective of this paper is to show the impacts of RE generation on the dispatch of generation from conventional plants while taking into account must-run capacities of combined heat and power (CHP) plants in district heating grids. Furthermore, the presented results give an estimation for the decrease of rotating masses that are caused by the replacement of conventional plants by RE converters. Subsequently, counteractive measures such as energy storage in the district heating grid and wind inertia control will be discussed.
引用
收藏
页码:326 / 332
页数:7
相关论文
共 21 条
[1]  
50Hertz Transmission GmbH, GRID DAT
[2]  
Anderson P.M., 1994, POWER SYSTEM CONTROL
[3]  
Beacon Power, 2014, BEAC POW 450 XP PERF
[4]  
Bevrani H, 2014, POWER ELECTRON POWER, P1, DOI 10.1007/978-3-319-07278-4
[5]  
Bollen M., 2013, INTEGRATION DISTRIBU
[6]  
Deutsche Energie-Agentur GmbH (dena), 2014, DEN STUD SYST STLEIS
[7]  
ENTSO-E, 2004, UCTE OPERATION HDB
[8]  
ENTSO-E-European Network of Transmission System Operators for Electricity, 2013, YEARL STAT AD RETR 2
[9]  
Erker M., 2013, INNOVATIONSKRAFTWERK
[10]  
Klopsch M., 2007, MAXIMIERUNG KRAFTPRO