ROGA - A New Method for Risk-Based Hazard Analysis: Part 1 - Deductive Hazard Analysis and Risk-Based Assessment by Using a Risk Graph

被引:2
作者
Bock, Franz-Josef [1 ]
Haferkamp, Klaus [1 ]
机构
[1] TUV Rheinland Ind Serv GmbH, Geschaftsfeld Anlagensicherheit Chemieanlagen, D-51105 Cologne, Germany
关键词
Hazard analysis; Risk-based analysis; Risk assessment; Risk graph; Safety integrity level;
D O I
10.1002/cite.201300113
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper proposes a new method, risk-oriented hazard analysis (ROGA), for carrying out the risk-based hazard analysis of chemical plants. The aim of ROGA method is to determine the status of a plant's safety technology by determining the risk that arises as a result of a source of hazard taking effect and by evaluating all measures taken to control this risk. The contribution consists of two parts. In this first part, the deductive hazard analysis and its extension by a semi-quantitative risk assessment associated with sources of hazards is explained with the help of a risk graph.
引用
收藏
页码:95 / 102
页数:8
相关论文
共 50 条
[41]   Risk-Based and Condition-Based Assessment Framework for Large Diameter Sewers [J].
Ibikunle, Olugbenga S. .
PIPELINES 2020: PLANNING AND DESIGN, 2020, :17-27
[42]   Risk-based Security Assessment Considering Corrective Control of TCSC Devices [J].
Shi, P. ;
Wen, Y. ;
Yan, Z. ;
Qian, J. ;
Deng, M. ;
Guo, C. .
2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014,
[43]   Risk-based climate-change impact assessment for the water industry [J].
Thorne, O. M. ;
Fenner, R. A. .
WATER SCIENCE AND TECHNOLOGY, 2009, 59 (03) :443-451
[44]   Risk-Based Probabilistic Voltage Stability Assessment in Uncertain Power System [J].
Deng, Weisi ;
Zhang, Buhan ;
Ding, Hongfa ;
Li, Hang .
ENERGIES, 2017, 10 (02)
[45]   Risk-based weight of evidence assessment of commercial sharks in western Australia [J].
Braccini, Matias ;
Hesp, Alex ;
Molony, Brett .
Braccini, Matias (Matias.Braccini@dpird.wa.gov.au), 1600, Elsevier Ltd (205)
[46]   Risk-based assessment of climate change impact on storm drainage system [J].
Alsaqqaf, Z. ;
Zhang, H. ;
Mohamed, S. .
FLOOD RECOVERY, INNOVATION AND RESPONSE II, 2010, 133 :13-24
[47]   Flood hazard risk assessment model based on random forest [J].
Wang, Zhaoli ;
Lai, Chengguang ;
Chen, Xiaohong ;
Yang, Bing ;
Zhao, Shiwei ;
Bai, Xiaoyan .
JOURNAL OF HYDROLOGY, 2015, 527 :1130-1141
[48]   Risk Level Assessment of Typhoon Hazard Based on Loss Utility [J].
Liu, Guilin ;
Yang, Bokai ;
Nong, Xiuxiu ;
Kou, Yi ;
Wu, Fang ;
Zhao, Daniel ;
Yu, Pubing .
JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2023, 11 (11)
[49]   Development of a Risk-based Decision Method for Construction Project Evaluation Using Value Theory [J].
Shah, Liaqat Ali ;
Amjad, Fahd ;
Vernadat, Francois .
PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, :695-700
[50]   Use of Monte Carlo analysis in a risk-based prioritization of toxic constituents in house dust [J].
Ginsberg, Gary L. ;
Belleggia, Giuliana .
ENVIRONMENT INTERNATIONAL, 2017, 109 :101-113