Solving a chemical batch scheduling problem by local search

被引:16
作者
Brucker, P [1 ]
Hurink, J
机构
[1] Univ Osnabruck, Dept Math, D-49069 Osnabruck, Germany
[2] Univ Twente, NL-7500 AE Enschede, Netherlands
关键词
case study; batch production; tabu search; general shop problem; time-lags; mixed graph scheduling;
D O I
10.1023/A:1018959704264
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper the following chemical batch scheduling problem is considered: a set of orders has to be processed on a set of facilities. For each order a given amount of a product must be produced by means of chemical reactions before a given deadline. The production consists of a sequence of processes whereby each process has to be performed by one facility out of a given subset of facilities allowed for this process. The processing times depend on the choice of the facility and the processing is done in batch mode with given minimum and maximum sizes. The problem is to assign the processes to the facilities, splitting them into batches, and scheduling these batches in order to produce the demands within the given deadlines. For the scheduling part of the problem we present an approach based on the following steps. First, a procedure to calculate the minimum number of batches needed to satisfy the demands is presented. Based on this,the given problem is modeled in two different ways: as a general shop scheduling problem with set-up times or as scheduling problem with positive time-lags. Finally, a two-phase tabu search method is presented which is based on the two different formulations of the problem. The method is tested on some real world data.
引用
收藏
页码:17 / 38
页数:22
相关论文
共 50 条
[41]   A tabu search heuristic to solve the scheduling problem for a batch-processing machine with non-identical job sizes [J].
Meng, Ying ;
Tang, Lixin .
PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, :1703-1707
[42]   Modeling and solving a sugarcane harvest front scheduling problem [J].
Ribeiro Junqueira, Rogerio de Avila ;
Morabito, Reinaldo .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 213 :150-160
[43]   Reinforcement learning-based local search for solving the quadratic 3-dimensional assignment problem [J].
Benzineb, Walid ;
Loukil, Lakhdar ;
Amrane, Bakhta ;
Benyamina, Abou El Hassan .
RAIRO-OPERATIONS RESEARCH, 2025, 59 (03) :1569-1586
[44]   A stochastic strategy for solving job shop scheduling problem [J].
Yin, AH ;
Huang, WQ .
2002 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-4, PROCEEDINGS, 2002, :434-439
[45]   TABU SEARCH STRATEGIES FOR SOLVING JOB SHOP SCHEDULING PROBLEMS [J].
Eswaramurthy, V. P. ;
Tamilarasi, A. .
JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2007, 6 (01) :59-75
[46]   Solving task scheduling in peer-to-peer by tabu search [J].
Li, Junqing ;
Xie, Shengxian ;
Sun, Tao ;
Wang, Yuting ;
Yang, Huaqing .
PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, :3348-3352
[47]   Scheduling of a multi-product batch process in the chemical industry [J].
Blomer, F ;
Gunther, HO .
COMPUTERS IN INDUSTRY, 1998, 36 (03) :245-259
[48]   A path relinking with tabu search algorithm for solving hybrid flow shop scheduling problem considering multiple critical paths [J].
Zhou, Hao ;
Liu, Hui ;
Lv, Chang ;
Zhang, Chaoyong ;
Shen, Weiming .
COMPUTERS & OPERATIONS RESEARCH, 2024, 170
[49]   Local search heuristics for single machine scheduling with batch set-up times to minimize total weighted completion time [J].
H.A.J. Crauwels ;
C.N. Potts ;
L.N. Van Wassenhove .
Annals of Operations Research, 1997, 70 :261-279
[50]   Tabu search based on novel neighborhood structures for solving job shop scheduling problem integrating finite transportation resources [J].
Yao, Youjie ;
Gui, Lin ;
Li, Xinyu ;
Gao, Liang .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2024, 89