Solving a chemical batch scheduling problem by local search

被引:16
|
作者
Brucker, P [1 ]
Hurink, J
机构
[1] Univ Osnabruck, Dept Math, D-49069 Osnabruck, Germany
[2] Univ Twente, NL-7500 AE Enschede, Netherlands
关键词
case study; batch production; tabu search; general shop problem; time-lags; mixed graph scheduling;
D O I
10.1023/A:1018959704264
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper the following chemical batch scheduling problem is considered: a set of orders has to be processed on a set of facilities. For each order a given amount of a product must be produced by means of chemical reactions before a given deadline. The production consists of a sequence of processes whereby each process has to be performed by one facility out of a given subset of facilities allowed for this process. The processing times depend on the choice of the facility and the processing is done in batch mode with given minimum and maximum sizes. The problem is to assign the processes to the facilities, splitting them into batches, and scheduling these batches in order to produce the demands within the given deadlines. For the scheduling part of the problem we present an approach based on the following steps. First, a procedure to calculate the minimum number of batches needed to satisfy the demands is presented. Based on this,the given problem is modeled in two different ways: as a general shop scheduling problem with set-up times or as scheduling problem with positive time-lags. Finally, a two-phase tabu search method is presented which is based on the two different formulations of the problem. The method is tested on some real world data.
引用
收藏
页码:17 / 38
页数:22
相关论文
共 50 条
  • [31] A Genetic Algorithm with a New Local Search Method for Solving the Multimode Resource-constrained Project Scheduling Problem
    Afshar, Mohammad Reza
    Shahhosseini, Vahid
    Sebt, Mohammad Hassan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (03) : 357 - 365
  • [32] Solving Flexible Job Shop Scheduling Problem Using a Discrete Particle Swarm Optimization with Iterated Local Search
    Huang, Song
    Tian, Na
    Wang, Yan
    Ji, Zhicheng
    THEORY, METHODOLOGY, TOOLS AND APPLICATIONS FOR MODELING AND SIMULATION OF COMPLEX SYSTEMS, PT I, 2016, 643 : 603 - 612
  • [33] A Novel Fast Parallel Batch Scheduling Algorithm for Solving the Independent Job Problem
    Zhang, Bin
    Wu, Dawei
    Song, Yingjie
    Liu, Kewei
    Xiong, Juxia
    APPLIED SCIENCES-BASEL, 2020, 10 (02):
  • [34] Solving the Unrelated Parallel Machine Scheduling Problem with Setup Times by Efficient Algorithms Based on Iterated Local Search
    Haddad, Matheus N.
    Cota, Luciano P.
    Souza, Marcone J. F.
    Maculan, Nelson
    ENTERPRISE INFORMATION SYSTEMS, ICEIS 2014, 2015, 227 : 131 - 148
  • [35] A new memetic global and local search algorithm for solving hybrid flow shop with multiprocessor task scheduling problem
    Batuhan Eren Engin
    Orhan Engin
    SN Applied Sciences, 2020, 2
  • [37] A new memetic global and local search algorithm for solving hybrid flow shop with multiprocessor task scheduling problem
    Engin, Batuhan Eren
    Engin, Orhan
    SN APPLIED SCIENCES, 2020, 2 (12):
  • [38] A New Bi-Objective Batch Scheduling Problem: NSGA-II-and-Local-Search-Based Memetic Algorithms
    Zhao, ZiYan
    Liu, ShiXin
    Zhou, MengChu
    2020 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2020, : 2119 - 2124
  • [39] SOLVING A GENERAL ROUTING AND SCHEDULING PROBLEM BY CHAIN DECOMPOSITION AND TABU SEARCH
    HOOKER, JN
    NATRAJ, NR
    TRANSPORTATION SCIENCE, 1995, 29 (01) : 30 - 44
  • [40] New search algorithm for solving the maintenance scheduling problem for a family of machines
    Huang, JY
    OPTIMIZATION METHODS & SOFTWARE, 2006, 21 (03): : 461 - 477