Performance Acceleration on Production Machines Using the Overall Equipment Effectiveness (OEE) Approach

被引:2
作者
Mansur, A. [1 ]
Rayendra, R. [1 ]
Mastur, M. I. [1 ]
机构
[1] Fac Ind TechnologyUII, Dept Ind Engn, Yogyakarta, Indonesia
来源
INTERNATIONAL CONFERENCE ON ENGINEERING AND TECHNOLOGY FOR SUSTAINABLE DEVELOPMENT (ICET4SD) 2015 | 2016年 / 105卷
关键词
D O I
10.1088/1757-899X/105/1/012019
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Mistakes during working can trigger a decrease in production level that may lead financial loss to the company. The factors that affect the mistakes are called losses, such as breakdown loss, set up/adjustment loss, idling and minor stoppage loss, reduced speed loss, reduced yield loss, and rework loss. The objective of the research is to accelerate the performance of the JSW 330T machine in PT. YogyaPresisiTehnikatamaIndustri. JSW 330T is a machine that has the highest downtime numbers. The method for measuring the effectiveness is using the Overall Equipment Effectiveness (OEE). The results of the research show that the JWQ 330T has average rate of the effectiveness (OEE) of 52.66%, availability ratioof 73.43%, performance efficiency rate of 83.58% and quality rate of 84.6%. From the six big losses calculation, the factor that affects the most on the low score of OEE is the breakdown loss which is 58.85% with total time loss of 929.65 hours in a year.
引用
收藏
页数:7
相关论文
共 15 条
  • [1] Bamber C.J., 1999, J QUAL MAINT ENG, V5, P162, DOI DOI 10.1108/13552519910282601
  • [2] Blanchard SB, 1997, J QUALITY MAINTENANC, V3
  • [3] Overall equipment effectiveness (OEE) and process capability (PC) measures
    Garza-Reyes, Jose
    Eldridge, Steve
    Barber, Kevin
    Soriano-Meier, Horacio
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2010, 27 (01) : 48 - +
  • [4] Habib Agil, 2012, JURNALTEKNIKPOMITSJU, V1, P1
  • [5] Jain A, 2012, INT RES J CONSORTIUM, V1
  • [6] Evaluation and improvement of manufacturing performance measurement systems - the role of OEE
    Jonsson, P
    Lesshammar, M
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1999, 19 (01) : 55 - 78
  • [7] Muchiri P, 2006, PERFORMANCE MEASUREM
  • [8] NakajimaS, 1988, INTRO TOTAL PRODUCTI
  • [9] Sherwin D, 2000, REV OVERALL MODELS M
  • [10] Supandi, 1990, MANAJEMENPERAWATANIN