Optimization of the Preventive Maintenance for a Multi-component System Using Genetic Algorithm

被引:1
|
作者
Dahia, Zakaria [1 ]
Bellaouar, Ahmed [1 ]
Billel, Soulmana [1 ]
机构
[1] Univ Constantine 1, LITE Lab, Constantine, Algeria
来源
RENEWABLE ENERGY FOR SMART AND SUSTAINABLE CITIES: ARTIFICIAL INTELLIGENCE IN RENEWABLE ENERGETIC SYSTEMS | 2019年 / 62卷
关键词
Preventive maintenance; Cost; Multi-components system; Optimization; Genetic algorithm; Preventive maintenance plan; AVAILABILITY; MODELS;
D O I
10.1007/978-3-030-04789-4_34
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The main goal of the manufacturers is to efficiently exploit their technological systems to improve their agility and productivity by using all available resources optimally in minimum time. For this, it is necessary to develop effective maintenance strategies to ensure the continuity of production and machine availability while minimizing the overall cost. Our work describes a policy adopted for the determination of the minimum cost of preventive maintenance of a multi-component system with respect to an availability constraint. For this, we have proposed a model that examines the situation of maintenance decision in which three actions, a minimal repair, a periodic overhaul and a complete renewal, the improvement of the system due to the maintenance action of a revision differs of the virtual age approach by considering a direct reduction of the failure rate. The genetic algorithm (GA) was used as a technique to optimize the cost function with respect to an availability constraint, i.e. to determine the optimum couples of periodicity of the preventive maintenance and the revision number. The results obtained considerably improved the preventive maintenance plan.
引用
收藏
页码:313 / 320
页数:8
相关论文
共 50 条
  • [1] An optimization of joint preventive maintenance for a multi-component system
    Zhao, Jianhua
    Zhao, Jianmin
    Proceedings of the Third International Conference on Information and Management Sciences, 2004, 3 : 213 - 217
  • [2] Multi-component manufacturing system maintenance scheduling based on degradation information using genetic algorithm
    Liu, Qinming
    Lv, Wenyuan
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2015, 115 (08) : 1412 - 1434
  • [3] Preventive maintenance optimization for a multi-component system under changing job shop schedule
    Zhou, Xiaojun
    Lu, Zhiqiang
    Xi, Lifeng
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 101 : 14 - 20
  • [4] Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units
    Laggoune, Radouane
    Chateauneuf, Alaa
    Aissani, Djamil
    COMPUTERS & CHEMICAL ENGINEERING, 2009, 33 (09) : 1499 - 1510
  • [5] Preventive maintenance scheduling for a multi-component system with non-negligible replacement time
    Laggoune, Radouane
    Chateauneuf, Alaa
    Aissani, Djamil
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2010, 41 (07) : 747 - 761
  • [6] A Genetic Algorithm to Minimize the Periodic Preventive Maintenance Cost in Electrical System
    Otsmani, Z.
    Khiat, M.
    Chaker, A.
    INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2011, 6 (03): : 1439 - 1446
  • [7] Optimization of a multilevel integrated preventive maintenance scheduling mathematical model using genetic algorithm
    Kamel, Gehad
    Aly, M. Fahmy
    Mohib, A.
    Afefy, Islam H.
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (04) : 247 - 257
  • [8] Discrete maintenance optimization of complex multi-component systems
    Bris, Radim
    Byczanski, Petr
    Gono, Radomir
    Rusek, Stanislav
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 168 : 80 - 89
  • [9] A value-based preventive maintenance policy for multi-component system with continuously degrading components
    Liu, Bin
    Xu, Zhengguo
    Xie, Min
    Kuo, Way
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2014, 132 : 83 - 89
  • [10] Probabilistic optimization of pavement preventive maintenance using multi-objective genetic algorithm
    Mohamed S. Yamany
    Dulcy M. Abraham
    Mario Ventresca
    Tommy Nantung
    Samuel Labi
    Innovative Infrastructure Solutions, 2025, 10 (5)