A heuristic approach to railway track maintenance scheduling

被引:33
作者
Quiroga, L. M. [1 ]
Schnieder, E. [1 ]
机构
[1] TU, Inst Traff Safety & Automat Technol, Braunschweig, Germany
来源
COMPUTERS IN RAILWAYS XII: COMPUTER SYSTEM DESIGN AND OPERATION IN RAILWAYS AND OTHER TRANSIT SYSTEMS | 2010年 / 114卷
关键词
track maintenance; heuristics; tamping; scheduling;
D O I
10.2495/CR100631
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal scheduling of maintenance interventions is an issue of increased relevance. In this work a method for optimization of the tamping scheduling is presented. It is based on a heuristic algorithm, which finds a very detailed tamping schedule where each planned intervention is fully specified. The algorithm tries to maximize an objective function, which is a quantitative expression of the maintenance process's objectives defined by the railway company. It first finds an upper bound for the objective function value, and then returns the best feasible solution found. The method is validated by means of a case study based on real data of the 240 km track of a French high speed TGV line. The results presented show that the value of the best solution found is very near to the upper bound (the difference is smaller than 1%), with a calculation time of under 1 second using a standard computer, so we think the heuristic has a great performance potential.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 9 条
[1]  
Esveld C., 2001, MODERN RAILWAY TRACK, VSecond
[2]  
Lake M, 2000, ADV TRANSPORT, V7, P895
[3]  
Meier-Hirmer C., 2007, THESIS U MARNE LA VA
[4]   A study on a mathematical model of the track maintenance scheduling problem [J].
Oh, S. M. ;
Lee, J. H. ;
Park, B. H. ;
Lee, H. U. ;
Hong, S. H. .
Computers in Railways X: Computer System Design and Operation in the Railway and Other Transit Systems, 2006, 88 :85-96
[5]   Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule [J].
Oyama, Tatsuo ;
Miwa, Masashi .
JAPAN JOURNAL OF INDUSTRIAL AND APPLIED MATHEMATICS, 2006, 23 (02) :207-224
[6]  
Quiroga L., 2010, P EUR SAF REL C ESRE
[7]  
Quiroga L.M., 2010, P STOCH MOD TECHN DA
[8]  
Ubalde L., 2005, P RAILW ENG 2005 8 I
[9]  
Veit P., 2007, RAILWAY TECHNICAL RE