The scheduling of deliveries in a production-distribution system with multiple buyers

被引:10
|
作者
Tang, Jiafu [1 ]
Yung, Kai-Leung [2 ]
Kaku, Iko [3 ]
Yang, Jianbo [4 ]
机构
[1] Northeastern Univ, Sch Informat Sci & Engn, MOE, Dept Syst Engn,Key Lab Integrated Automat Proc In, Shenyang 110004, Peoples R China
[2] Hong Kong Polytech Univ, Dept Ind & Syst Engn, SAR, Kowloon, Hong Kong, Peoples R China
[3] Akita Prefectural Univ, Dept Management Sci & Engn, Akita, Japan
[4] Univ Manchester, Manchester Business Sch, Decis Sci & Operat Management Grp, Manchester M15 6PB, Lancs, England
基金
中国国家自然科学基金;
关键词
buyer-vendor coordination; scheduling of deliveries; heuristics procedure; lot-for-lot-policy;
D O I
10.1007/s10479-007-0291-0
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In a real production and distribution business environment with one supplier and multiple heterogeneous buyers, the differences in buyers' ordering cycles have influence on production arrangements. Consequently, the average inventory level (AIL) at the supplier's end is affected by both the production policy and the ordering policy, typically by the scheduling of deliveries. Consequently, the average inventory holding cost is most deeply affected. In this paper, it is proposed that the scheduling of deliveries be formulated as a decision problem to determine the time point at which deliveries are made to buyers in order to minimize the supplier's average inventory. A formulation of the average inventory level (AIL) in a production cycle at the supplier's end using a lot-for-lot policy is developed. Under the lot-for-lot policy, the scheduling of deliveries (SP) is formulated as a nonlinear programming model used to determine the first delivery point for each buyer with an objective to minimize the sum of the product of the individual demand quantity and the first delivery time for each buyer. Thus, the SP model determines not only the sequence of the first deliveries to individual buyers, but also the time when the deliveries are made. An iterative heuristic procedure (IHP) is developed to solve the SP model assuming a given sequence of buyers. Six sequence rules are considered and evaluated via simulation.
引用
收藏
页码:5 / 23
页数:19
相关论文
共 50 条
  • [21] Control of production-distribution systems with unknown inputs and system failures
    Univ of Udine, Udine, Italy
    Proc IEEE Conf Decis Control, (2710-2715):
  • [22] A One-Vendor Multiple-Buyer Production-Distribution System: The Value of Vendor Managed Inventory
    Li, Yunfan
    Huang, Xiao
    INFOR, 2015, 53 (01) : 13 - 25
  • [23] Control of production-distribution systems with unknown inputs and system failures
    Blanchini, F
    Miani, S
    Ukovich, W
    PROCEEDINGS OF THE 37TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1998, : 2710 - 2715
  • [24] Heuristic procedure based schedule of orders in a production-distribution system
    Tang, JF
    Yung, KL
    Kaku, I
    Wang, DW
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 115 - 120
  • [25] The integrated production-distribution scheduling in parallel machine environment by using improved genetic algorithms
    Kazemi, Hamed
    Mahdavi Mazdeh, Mohammad
    Rostami, Mohammad
    Heydari, Mahdi
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2021, 38 (03) : 157 - 170
  • [26] Optimal spare parts production-distribution scheduling considering operational utility on customer equipment
    Zhao, Yan
    Deng, Qianwang
    Zhang, Like
    Han, Weifeng
    Li, Fengyuan
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 214
  • [27] Scheduling deliveries in vehicles with multiple compartments
    Chajakis, ED
    Guignard, M
    JOURNAL OF GLOBAL OPTIMIZATION, 2003, 26 (01) : 43 - 78
  • [28] A Decision Model to Plan Optimally Production-Distribution of Seafood Product with Multiple Locations
    Firmansyah, Firmansyah
    Mawengkang, Herman
    Mujib, Abdul
    Mathelinea, Devy
    MATHEMATICS, 2022, 10 (18)
  • [29] Single Supplier Scheduling for Multiple Deliveries
    T.C. Edwin Cheng
    Mikhail Y. Kovalyov
    Annals of Operations Research, 2001, 107 : 51 - 63
  • [30] Production-distribution planning with fuzzy costs
    Demirli, Kudret
    Yimer, Alebachew D.
    NAFIPS 2006 - 2006 ANNUAL MEETING OF THE NORTH AMERICAN FUZZY INFORMATION PROCESSING SOCIETY, VOLS 1 AND 2, 2006, : 702 - +