A new t-chart using process capability index

被引:9
作者
Aslam, Muhammad [1 ]
Mohsin, Muhammad [2 ]
Jun, Chi-Hyuck [3 ]
机构
[1] King Abdulaziz Univ, Dept Stat, Fac Sci, Jeddah 21589, Saudi Arabia
[2] Govt Coll Univ, Dept Stat, Lahore, Pakistan
[3] Postech, Dept Ind & Management Engn, Pohang, South Korea
关键词
Control chart; Exponential distribution; Process capability index; t-chart; HEALTH-CARE; PRODUCT ACCEPTANCE; CUSUM; SURVEILLANCE; DESIGN; TIME;
D O I
10.1080/03610918.2016.1146759
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Control charts play a vital role to enhance the efficiency of the manufacturing process. In many situations, the quality characteristic of interest to be monitored follows a non-normal distribution. In this article, we propose a new control chart using the process capability index when the quality characteristic follows the exponential distribution. The performance of the proposed chart is evaluated using the Monte Carlo simulation. Tables are presented for various values of specified average run length and sample size. The use of the proposed control chart is discussed with the help of an example.
引用
收藏
页码:5141 / 5150
页数:10
相关论文
共 37 条
[31]   A Review and Perspective on Surveillance of Bernoulli Processes [J].
Szarka, John L., III ;
Woodall, William H. .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2011, 27 (06) :735-752
[32]   AVERAGE RUN LENGTHS FOR CUSUM SCHEMES WHEN OBSERVATIONS ARE EXPONENTIALLY DISTRIBUTED [J].
VARDEMAN, S ;
RAY, DO .
TECHNOMETRICS, 1985, 27 (02) :145-150
[33]   The use of control charts in health-care and public-health surveillance [J].
Woodall, WH .
JOURNAL OF QUALITY TECHNOLOGY, 2006, 38 (02) :89-104
[34]   A variables sampling plan based on Cpmk for product acceptance determination [J].
Wu, Chien-Wei ;
Pearn, W. L. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (02) :549-560
[35]   Some effective control chart procedures for reliability monitoring [J].
Xie, M ;
Goh, TN ;
Ranjan, P .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2002, 77 (02) :143-150
[36]   Economic design of exponential charts for time between events monitoring [J].
Zhang, CW ;
Xie, M ;
Goh, TN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (23) :5019-5032
[37]   Economic design of time-between-events control chart system [J].
Zhang, H. Y. ;
Xie, M. ;
Goh, T. N. ;
Shamsuzzaman, M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) :485-492