A new t-chart using process capability index

被引:9
作者
Aslam, Muhammad [1 ]
Mohsin, Muhammad [2 ]
Jun, Chi-Hyuck [3 ]
机构
[1] King Abdulaziz Univ, Dept Stat, Fac Sci, Jeddah 21589, Saudi Arabia
[2] Govt Coll Univ, Dept Stat, Lahore, Pakistan
[3] Postech, Dept Ind & Management Engn, Pohang, South Korea
关键词
Control chart; Exponential distribution; Process capability index; t-chart; HEALTH-CARE; PRODUCT ACCEPTANCE; CUSUM; SURVEILLANCE; DESIGN; TIME;
D O I
10.1080/03610918.2016.1146759
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Control charts play a vital role to enhance the efficiency of the manufacturing process. In many situations, the quality characteristic of interest to be monitored follows a non-normal distribution. In this article, we propose a new control chart using the process capability index when the quality characteristic follows the exponential distribution. The performance of the proposed chart is evaluated using the Monte Carlo simulation. Tables are presented for various values of specified average run length and sample size. The use of the proposed control chart is discussed with the help of an example.
引用
收藏
页码:5141 / 5150
页数:10
相关论文
共 37 条
[1]   Monitoring reduction in variability with the range [J].
Acosta-Mejia, CA .
IIE TRANSACTIONS, 1998, 30 (06) :515-523
[2]   Designing of X-bar control charts based on process capability index using repetitive sampling [J].
Ahmad, Liaquat ;
Aslam, Muhammad ;
Jun, Chi-Hyuck .
TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2014, 36 (03) :367-374
[3]   A control chart for an exponential distribution using multiple dependent state sampling [J].
Aslam, Muhammad ;
Azam, Muhammad ;
Khan, Nasrullah ;
Jun, Chi-Hyuck .
QUALITY & QUANTITY, 2015, 49 (02) :455-462
[4]   Designing of a new monitoring t-chart using repetitive sampling [J].
Aslam, Muhammad ;
Khan, Nasrullah ;
Azam, Muhammad ;
Jun, Chi-Hyuck .
INFORMATION SCIENCES, 2014, 269 :210-216
[5]   Designing of a hybrid exponentially weighted moving average control chart using repetitive sampling [J].
Azam, Muhammad ;
Aslam, Muhammad ;
Jun, Chi-Hyuck .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (9-12) :1927-1933
[6]  
Balamurali S., 2003, Quality Engineering, V15, P643, DOI 10.1081/QEN-120018395
[7]  
Balamurali S., 2002, Int J Qual Reliab Manag, V19, P1088, DOI DOI 10.1108/02656710210442875
[8]   Robustness of the time between events CUSUM [J].
Borror, CM ;
Keats, JB ;
Montgomery, DC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (15) :3435-3444
[9]   Cumulative quantity control charts for monitoring production processes [J].
Chan, LY ;
Xie, M ;
Goh, TN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (02) :397-408
[10]   An ARL-unbiased design of time-between-events control charts with runs rules [J].
Cheng, Chuen-Sheng ;
Chen, Pei-Wen .
JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2011, 81 (07) :857-871