Development of a Fuzzy-Boundary Interval Programming Method for Water Quality Management Under Uncertainty

被引:15
|
作者
Liu, J. [1 ]
Li, Y. P. [1 ]
Huang, G. H. [1 ]
Nie, S. [2 ]
机构
[1] North China Elect Power Univ, SC Resources & Environm Res Acad, MOE Key Lab Reg Energy Syst Optimizat, Beijing 102206, Peoples R China
[2] Univ Toronto, Fac Engn & Appl Sci, Toronto, ON M5S 1A4, Canada
关键词
Fuzzy-boundary; Interval; Management; Optimization; Water quality; Dual uncertainty; OPTIMIZATION APPROACH; VERTEX METHOD; SIMULATION; MODEL; POLLUTION; SYSTEMS;
D O I
10.1007/s11269-014-0867-9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study develops a fuzzy-boundary interval programming (FBIP) method for tackling dual uncertainties expressed as crisp intervals and fuzzy-boundary intervals. An interactive algorithm and a vertex analysis approach are proposed for solving the FBIP model and solutions with alpha-cut levels have been generated. FBIP is applied to planning water quality management of Xiangxi River in the Three Gorges Reservoir Region, China. Biological oxygen demand (BOD), total nitrogen (TN), and total phosphorus (TP) are selected as water quality indicators to determine the pollution control strategies. Results reveal that the highest discharge of BOD is observed at the Baishahe chemical plant, among all point and nonpoint sources; crop farming is the main nonpoint source with the excessive nitrogen loading due to too much uses of livestock manures and chemical fertilizers; phosphorus discharge derives mainly from point sources (i.e. chemical plants and phosphorus mining companies). Abatement of pollutant discharges from industrial and agricultural activities is critical for the river pollution control; however, the implementation of management practices for pollution control can have potentials to affect the local economic income. These findings can help generate desired decisions for identifying various industrial and agricultural activities in association with both maximizing economic income and mitigating river-water pollution.
引用
收藏
页码:1169 / 1191
页数:23
相关论文
共 50 条
  • [31] Design optimization of hybrid uncertain structures with fuzzy-boundary interval variables
    Lu, Hui
    Yang, Kun
    Huang, Xiaoting
    Yin, Hui
    INTERNATIONAL JOURNAL OF MECHANICS AND MATERIALS IN DESIGN, 2021, 17 (01) : 201 - 224
  • [32] A dual-interval fixed-mix stochastic programming method for water resources management under uncertainty
    Liu, J.
    Li, Y. P.
    Huang, G. H.
    Zeng, X. T.
    RESOURCES CONSERVATION AND RECYCLING, 2014, 88 : 50 - 66
  • [33] Mathematical Modeling for Water Quality Management under Interval and Fuzzy Uncertainties
    Liu, J.
    Li, Y. P.
    Huang, G. H.
    JOURNAL OF APPLIED MATHEMATICS, 2013,
  • [34] A Generalized Fuzzy Integer Programming Approach for Environmental Management under Uncertainty
    Fan, Y. R.
    Huang, G. H.
    Huang, K.
    Jin, L.
    Suo, M. Q.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [35] A full fuzzy-interval credibility-constrained nonlinear programming approach for irrigation water allocation under uncertainty
    Yue, Qiong
    Zhang, Fan
    Zhang, Chenglong
    Zhu, Hua
    Tang, Yikuan
    Guo, Ping
    AGRICULTURAL WATER MANAGEMENT, 2020, 230
  • [36] Interval-parameter Two-stage Stochastic Semi-infinite Programming: Application to Water Resources Management under Uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Zhu, H.
    WATER RESOURCES MANAGEMENT, 2009, 23 (05) : 1001 - 1023
  • [37] A Hybrid Dynamic Dual Interval Programming for Irrigation Water Allocation under Uncertainty
    Jin, Lei
    Huang, Guohe
    Fan, Yurui
    Nie, Xianghui
    Cheng, Guanhui
    WATER RESOURCES MANAGEMENT, 2012, 26 (05) : 1183 - 1200
  • [38] An interactive inexact fuzzy bounded programming approach for agricultural water quality management
    Zhang, Y. M.
    Lu, H. W.
    Nie, X. H.
    He, L.
    Du, P.
    AGRICULTURAL WATER MANAGEMENT, 2014, 133 : 104 - 111
  • [39] Improved interval-fuzzy quadratic programming for management of filters in a fluid power system under uncertainty
    Nie, S. L.
    Hu, Z.
    Li, Y. P.
    Huang, G. H.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2010, 224 (E2) : 103 - 118
  • [40] Fuzzy two-stage quadratic programming for planning solid waste management under uncertainty
    Li, Y. P.
    Huang, G. H.
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2007, 38 (03) : 219 - 233