Performance of PAM/PEI gel system for water shut-off in high temperature reservoirs: Laboratory study

被引:34
|
作者
ElKarsani, Khalid S. M. [1 ]
Al-Muntasheri, Ghaithan A. [2 ]
Sultan, Abdulla S. [1 ,3 ]
Hussein, Ibnelwaleed A. [4 ]
机构
[1] King Fahd Univ Petr & Minerals, Res Inst, Ctr Petr & Minerals, Dhahran 31261, Saudi Arabia
[2] EXPEC Adv Res Ctr, Prod Technol Team, Dhahran 31311, Saudi Arabia
[3] King Fahd Univ Petr & Minerals, Dept Petr Engn, Dhahran 31261, Saudi Arabia
[4] King Fahd Univ Petr & Minerals, Dept Chem Engn, Dhahran 31261, Saudi Arabia
关键词
cross-linking; gels; rheology;
D O I
10.1002/app.41869
中图分类号
O63 [高分子化学(高聚物)];
学科分类号
070305 ; 080501 ; 081704 ;
摘要
A polymer gel is one of the common remediate methods to either reduce or totally block excessive water production in oilfields. Some systems demonstrated an excellent performance in treating the problem like polyacrylamide tert-butyl acrylate (PAtBA)/polyethylenimine (PEI). In this study, polyacrylamide (PAM) was introduced as a cheap alternative to PAtBA that can tolerate high salinity reservoirs. The thermal stability of the PAM/PEI polymeric gel in saline water was examined at 150 degrees C (302F). Samples prepared in sea water showed better stability compared with distilled and field water. Dynamic rheology and core-flooding experiments were used to evaluate the PAM / PEI gel system at high temperatures. NaCl and NH4Cl were evaluated as a possible retarders for delaying the gelation time in order to achieve a successful placement. NH4Cl was found to be more effective retarder. Core-flooding tests were conducted in sandstone and carbonate cores. The subject polymer gel was injected at rates typical of those in field applications. The injectivity of PAM/PEI was tested in Berea sandstone cores with initial permeability of approximate to 45 mD. The post-treatment of the system showed a permeability reduction of approximate to 94% for a period of two weeks. The injectivity in low permeability carbonate cores required more retardation compared with the injectivity in sandstone cores. The gel reduced the permeability to brine in Indiana limestone core by 99.8% for more than 5 months. Rheology of cured gel samples indicated that the gel strength needs about one day of curing in the core for the strength to stabilize. (c) 2015 Wiley Periodicals, Inc. J. Appl. Polym. Sci. 2015, 132, 41869.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Study on Profile Control and Water Shut-Off Performance of Interpenetrating Network Polymer Gel Composite System in Shallow Low Temperature Fractured Oil Layer
    Fang, Yujia
    Yang, Erlong
    Cui, Xiaona
    CHEMISTRYSELECT, 2019, 4 (27): : 8158 - 8164
  • [22] NOVEL WATER SHUT OFF METHOD BASED ON TEMPORARY PLUGGING AGENT AND GEL COMPOSITION SHUT-OFF
    Veliyev, E. F.
    Shovgenov, A. D.
    SOCAR PROCEEDINGS, 2023, : 96 - 101
  • [23] Application of gel systems for water shut-off on Uzbekistan oil fields
    Abdullayev, V. J.
    Veliyev, R. G.
    Ryabov, S. S.
    Krupin, G. G.
    Rahimov, U. Z.
    SOCAR PROCEEDINGS, 2023, 2023 (01): : 68 - 73
  • [24] Experimental investigation of asphaltene-augmented gel polymer performance for water shut-off and enhancing oil recovery in fractured oil reservoirs
    Hasankhani, Ghodsieh Moosa
    Madani, Mohammad
    Esmaeilzadeh, Feridun
    Mowla, Dariush
    JOURNAL OF MOLECULAR LIQUIDS, 2019, 275 : 654 - 666
  • [25] Polyacrylamide gel polymer as water shut-off system: Preparation and investigation of physical and chemical properties in one of the Iranian oil reservoirs conditions
    Simjoo, Mohammad
    Vafaie Sefti, Mohsen
    Dadvand Koohi, Ahmad
    Hasheminasab, Reza
    Sajadian, Valiahmad
    IRANIAN JOURNAL OF CHEMISTRY & CHEMICAL ENGINEERING-INTERNATIONAL ENGLISH EDITION, 2007, 26 (04): : 99 - 108
  • [26] Water shut-off by wettability alteration to gas-wetness in modelled gas reservoirs
    Li, Kewen
    Ge, Long
    Zhang, Haoping
    PETROLEUM GEOSCIENCE, 2015, 21 (2-3) : 211 - 216
  • [27] Water shut-off pilot test at a deep well with high temperature and bottom water in Shixi oilfield
    Zhu, Huai-Jiang
    Liu, Xian-Ling
    Liu, Yu-Zhang
    Wang, Jia-Huai
    Pan, Jing-Jun
    Shiyou Xuebao/Acta Petrolei Sinica, 2003, 24 (01):
  • [28] Experience in the Application of Water Shut-off and Remedial Cementing Technologies in Fractured Carbonate Reservoirs
    Baykova, E. N.
    Muslimov, R. Kh.
    GEORESURSY, 2016, 18 (03) : 175 - 183
  • [29] EVALUATION OF NOVEL ORGANICALLY CROSSLINKED POLYMER GEL FOR WATER SHUT-OFF PURPOSES
    Veliyev, E. F.
    Aliyev, A. A.
    SOCAR PROCEEDINGS, 2023, (02): : 40 - 45
  • [30] Low Temperature Nanostructured Gelling Compositions for Water Shut-off Purposes
    Kozlov, V. V.
    Altunina, L. K.
    Stasyeva, L. A.
    Kuvshinov, V. A.
    Rozhdestvenskiy, E. A.
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS WITH HIERARCHICAL STRUCTURE FOR NEW TECHNOLOGIES AND RELIABLE STRUCTURES 2019, 2019, 2167