Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and height

被引:25
作者
Noorzai, Esmatullah [1 ]
Golabchi, Mahmood [1 ]
机构
[1] Univ Tehran, Dept Project & Construct Management, Tehran, Iran
关键词
Success criteria; Mass housing methods; The height of construction; The volume of construction; LIFE-CYCLE ASSESSMENT; HONG-KONG; SUSTAINABLE CONSTRUCTION; PERFORMANCE CRITERIA; BUILDING SYSTEMS; PREFABRICATION; TECHNOLOGIES; BARRIERS; MODEL;
D O I
10.1108/JEDT-09-2019-0227
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose As the population grows, one of the major global crises is the management of human settlement. A proper solution to deal with this issue is mass housing. Given the variable needs in these projects, two constraints of height and volume of construction play an essential role in fulfilling success criteria. Hence, this paper aims to choose the most appropriate building method to satisfy time, cost, quality and safety factors considering the volume and height of construction. Design/methodology/approach In this research, the proper construction methods in mass housing projects in two volumes of up to 1000 (small) and 1000-3000 (medium) residential units in three ranges of the height of 5, 5-10, and higher than ten floors were determined with a focus on the success criteria based on real experiences through questionnaires and interviews. Findings The results show that steel bolt and nut and tunnel framework systems in higher than five-floor building projects act better than other methods, while in up to five-floor building projects, LSF saves time and cost and steel bolt and nut provides higher quality and safety. Originality/value Given the extent of work, the results of this research can be considered as a benchmark in the mass housing industry.
引用
收藏
页码:883 / 903
页数:21
相关论文
共 95 条
[1]  
Ahn H, 2017, INT CONF BIG DATA, P410, DOI 10.1109/BIGCOMP.2017.7881746
[2]   Multi-criteria evaluation model for the selection of sustainable materials for building projects [J].
Akadiri, Peter O. ;
Olomolaiye, Paul O. ;
Chinyio, Ezekiel A. .
AUTOMATION IN CONSTRUCTION, 2013, 30 :113-125
[3]   Corrupt Practices in the Construction Industry: Survey of Ghanaian Experience [J].
Ameyaw, Ernest E. ;
Parn, Erika ;
Chan, Albert P. C. ;
Owusu-Manu, De-Graft ;
Edwards, David John ;
Darko, Amos .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (06)
[4]  
[Anonymous], GUID PROJ MAN BOD KN
[5]  
[Anonymous], 64CIFE STANF U
[6]  
[Anonymous], COD PRACT BUILD
[7]  
[Anonymous], THESIS
[8]  
[Anonymous], J EARTHQUAKE ENG
[9]   Seismic Performance Evaluation of Asymmetric Reinforced Concrete Tunnel Form Buildings [J].
Aval, Seyed Bahram Beheshti ;
Asayesh, Mohammad Javad .
STRUCTURES, 2017, 10 :157-169
[10]   Integration of ELECTRE III and PROMETHEE II Decision-Making Methods with an Interval Approach: Application in Selection of Appropriate Structural Systems [J].
Balali, Vahid ;
Zahraie, Banafsheh ;
Roozbahani, Abbas .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) :297-314