Prediction Model of TBM Disc Cutter Wear During Tunnelling in Heterogeneous Ground

被引:143
作者
Ren, Dong-Jie [1 ,2 ]
Shen, Shui-Long [1 ,2 ]
Arulrajah, Arul [3 ]
Cheng, Wen-Chieh [1 ,2 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, State Key Lab Ocean Engn, Shanghai 200240, Peoples R China
[2] Shanghai Jiao Tong Univ, Dept Civil Engn, Collaborat Innovat Ctr Adv Ship & Deep Sea Explor, Shanghai 200240, Peoples R China
[3] Swinburne Univ Technol, Dept Civil & Construct Engn, Melbourne, Vic 3122, Australia
关键词
Prediction model; Friction energy; Disc cutter wear; Heterogeneous ground; OPTIMIZATION TECHNIQUES; ROCK; SOIL; STRESS; METRO; FACE; PENETRATION; PERFORMANCE; EXCAVATION; DEPOSITS;
D O I
10.1007/s00603-018-1549-3
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
When shield tunnelling is constructed in complex geological conditions using a tunnel boring machine, the disc cutter in the cutterhead easily wears to the failure state, particularly when the ground conditions are heterogeneous. This paper summarises the failure modes of the disc cutter in heterogeneous ground conditions into three categories, based on the observed wear data from field: (1) uniform disc cutter wear, (2) non-uniform disc cutter wear, and (3) breakage of cutter ring. Subsequently, the stress state of a disc cutter in the heterogeneous ground was analysed and the effective factors were investigated. The relationships between friction energy during cutting, working status of the machine and the characteristics of the geological conditions were evaluated. Based on the stress analysis and friction energy, a prediction model was proposed. The proposed model was applied to two field case studies: pertaining to uniform and mixed-face ground conditions, for which the empirical coefficient k for energy transfer was also determined. The preliminary results from this research indicated that the proposed model was valid for both homogeneous and heterogeneous ground conditions. Further case studies provided by co-operators are expected to improve the effectiveness of the proposed model.
引用
收藏
页码:3599 / 3611
页数:13
相关论文
共 56 条
[41]   Characterization of semi-top-down excavation for subway station in Shanghai soft ground [J].
Tan, Yong ;
Zhu, Hehua ;
Peng, Fangle ;
Karlsrud, Kjell ;
Wei, Bin .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 68 :244-261
[42]   Case studies of TBM tunneling performance in rock-soil interface mixed ground [J].
Toth, Akos ;
Gong, Qiuming ;
Zhao, Jian .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 38 :140-150
[43]   Disc cutter wear prediction for a hard rock TBM cutterhead based on energy analysis [J].
Wang, Lihui ;
Kang, Yilan ;
Zhao, Xiangjun ;
Zhang, Qian .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 50 :324-333
[44]   ANALYSIS OF DEEP EXCAVATION IN BOSTON [J].
WHITTLE, AJ ;
HASHASH, YMA ;
WHITMAN, RV .
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1993, 119 (01) :69-90
[45]   Application of WiFi-based indoor positioning system for labor tracking at construction sites: A case study in Guangzhou MTR [J].
Woo, Sunkyu ;
Jeong, Seongsu ;
Mok, Esmond ;
Xia, Linyuan ;
Choi, Changsu ;
Pyeon, Muwook ;
Heo, Joon .
AUTOMATION IN CONSTRUCTION, 2011, 20 (01) :3-13
[46]   Soil-tunnel interaction modelling for shield tunnels considering shearing dislocation in longitudinal joints [J].
Wu, Huai-Na ;
Shen, Shui-Long ;
Yang, Jun ;
Zhou, Annan .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 78 :168-177
[47]   Identification of Tunnel Settlement Caused by Land Subsidence in Soft Deposit of Shanghai [J].
Wu, Huai-Na ;
Shen, Shui-Long ;
Yang, Jun .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (06)
[48]   Longitudinal structural modelling of shield tunnels considering shearing dislocation between segmental rings [J].
Wu, Huai-Na ;
Shen, Shui-Long ;
Liao, Shao-Ming ;
Yin, Zhen-Yu .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 50 :317-323
[49]   Design of sponge city: Lessons learnt from an ancient drainage system in Ganzhou, China [J].
Xu, Ye-Shuang ;
Shen, Shui-Long ;
Lai, Yue ;
Zhou, An-Nan .
JOURNAL OF HYDROLOGY, 2018, 563 :900-908
[50]   Application of various optimization techniques and comparison of their performances for predicting TBM penetration rate in rock mass [J].
Yagiz, Saffet ;
Karahan, Halil .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2015, 80 :308-315