Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects

被引:23
作者
Pham, Hai [1 ]
Luu, Truong-Van [2 ]
Kim, Soo-Yong [3 ]
Vien, Duc-Thinh [4 ]
机构
[1] Pukyong Natl Univ, AInterdisciplinary Program Construct Engn & Manag, Busan 48513, South Korea
[2] Ho Chi Minh City Open Univ, Fac Civil & Elect Engn, Dept Construct Management, Ho Chi Minh City 70000, Vietnam
[3] Pukyong Natl Univ, Dept Civil Engn, Busan 48513, South Korea
[4] Southern Power Project Management Board, Ho Chi Minh City 70000, Vietnam
关键词
Cost overrun; Transmission lines; Construction; Vietnam; DECISION-MAKING; RISK; DETERMINANTS; DEVIATIONS; COUNTRIES;
D O I
10.1007/s12205-020-1391-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Infrastructure projects are very essential in societies today because they enable the uninterrupted flow of goods, services, and information across any country. Although much research has been done to investigate cost overrun in different infrastructure projects such as transport, bridge, power plant, road, or even petroleum; little is known about what factors cause the most significant cost overrun in transmission lines construction projects. In order to fill this literature gap, the current study is aimed at identifying main cost overrun factors in these projects. A literature review is first conducted to capture causes of cost overrun in the construction industry. A survey questionnaire is then designed to collect data from transmission lines projects in Vietnam. Factor analysis is applied and seven factors of construction cost overrun are extracted including: risks, resources, incompetence of parties, firm policies, project policies, poor collaboration of parties, and components, transportation and machinery cost. A regression model is subsequently developed to assess the impact level of these seven factors on cost overrun. It is concluded that risks, resources, incompetence of parties, and components, transportation and machinery cost are the four main causes of cost overrun in transmission lines projects while the remaining factors are found to have no impact. The paper ends by pointing out limitations of the study and providing some suggestions for future research.
引用
收藏
页码:1029 / 1036
页数:8
相关论文
共 52 条
[1]   Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach [J].
Abu El-Maaty, Ahmed Ebrahim ;
El-Kholy, Amr M. ;
Akal, Ahmed Yousry .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) :809-827
[2]   Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications [J].
Adam, Abderisak ;
Josephson, Per-Erik Bertil ;
Lindahl, Goran .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) :393-406
[3]   Factors affecting contractors' risk of cost overburden [J].
Akinci, B ;
Fischer, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (01) :67-76
[4]   Safety risk management for electrical transmission and distribution line construction [J].
Albert, Alex ;
Hallowell, Matthew R. .
SAFETY SCIENCE, 2013, 51 (01) :118-126
[5]  
Amadi AI, 2017, J FINANC MANAG PROP, V22, P269, DOI 10.1108/JFMPC-03-2017-0008
[6]   THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA [J].
Andric, Jelena M. ;
Mahamadu, Abdul-Majeed ;
Wang, Jiayuan ;
Zou, Patrick X. W. ;
Zhong, Ruoyu .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) :203-214
[7]  
Azhar N., 2008, Construction in developing countries proceedings of the 1st international conference, Karachi, P499
[8]   Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry [J].
Bin Seddeeq, Abdulaziz ;
Assaf, Sadi ;
Abdallah, Abdullatif ;
Hassanain, Mohammad A. .
BUILDINGS, 2019, 9 (02)
[9]  
Brandt C, 2011, TRANSMISSION DISTRIB, V63
[10]   Exogenous determinants of cost deviations and overruns in local infrastructure projects [J].
Catalao, Francisco Pinheiro ;
Cruz, Carlos Oliveira ;
Sarmento, Joaquim Miranda .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2019, 37 (12) :697-711