Excess Revenue Allocation for Build-Operate-Transfer Highway Projects

被引:0
|
作者
Song, Jinbo [1 ]
Jin, Lulu [2 ]
Dong, Wanli [2 ]
机构
[1] Dalian Univ Technol, Fac Econ & Management, Hitech Ind Zone, Dalian 116024, Liaoning, Peoples R China
[2] Dalian Univ Technol, Fac Econ & Management, Dalian 116024, Liaoning, Peoples R China
基金
中国国家自然科学基金;
关键词
PUBLIC-PRIVATE PARTNERSHIPS; CAPACITY CHOICE; ROAD NETWORK; REAL OPTION; CONTRACTS; GUARANTEE; EXPERIENCE;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Revenue uncertainty and volatility are problems in BOT highway projects because it is difficult to predict accurately future traffic volume. In high traffic demands, the absence of an excess revenue allocation mechanism leads to the private sector obtaining huge profits, and a high revenue risk to the government and the public. To solve this problem, the Black-Scholes ( B-S) pricing method is used to determine the revenue cap, and a dynamic model is proposed to determine the excess revenue allocation proportion considering the consumer surplus rate and the revenue cap. Finally, the proposed model is illustrated by a numerical example.
引用
收藏
页码:304 / 324
页数:21
相关论文
共 50 条
  • [31] Comparison of royalty methods for build-operate-transfer projects from a negotiation perspective
    Kang, Chao-Chung
    Feng, Cheng-Min
    Kuo, Chiu-Yen
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2012, 48 (04) : 830 - 842
  • [32] Financial Evaluation of Build-Operate-Transfer Projects: A Case Study of Myanmar Ports
    Lin, Khin
    Yang Hua-long
    Banomyong, Ruth
    2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL I, 2011, : 254 - 257
  • [33] A Decision Method of Concession Period for Build-Operate-Transfer Projects of Sewage Treatment
    Song Jinbo
    Han Shoudong
    Wang Dongbo
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7668 - 7671
  • [34] Modeling ceiling price for build-operate-transfer road projects in developing countries
    Nguyen Hoang-Tung
    Do Viet Hung
    Kato, Hironori
    Phan Le Binh
    ECONOMICS OF TRANSPORTATION, 2021, 28
  • [35] Highway pricing and capacity choice in a road network under a build-operate-transfer scheme
    Yang, H
    Meng, Q
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2000, 34 (03) : 207 - 222
  • [36] CONCESSION MODEL FOR FAIR DISTRIBUTION OF BENEFITS AND RISKS IN BUILD-OPERATE-TRANSFER ROAD PROJECTS
    Yan, Xue
    Chong, Heap-Yih
    Zhou, Jing
    Li, Qian
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) : 265 - 275
  • [37] Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects
    Zhang, XQ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (10): : 1054 - 1064
  • [38] SOCIAL APPRAISAL OF THE BUILD-OPERATE-TRANSFER PROJECTS OF PUBLIC OWNED UTILITY INDUSTRIES IN COMPARISON TO TURNKEY PROJECTS
    DIAMANDIS, PF
    DIACOGIANNIS, GP
    PUBLIC FINANCE-FINANCES PUBLIQUES, 1994, 49 (01): : 12 - 41
  • [39] Analysis of a Build-Operate-Transfer Scheme for Road Franchising
    Guo, Xiaolei
    Yang, Hai
    INTERNATIONAL JOURNAL OF SUSTAINABLE TRANSPORTATION, 2009, 3 (5-6) : 312 - 338
  • [40] A note on "highway pricing and capacity choice in a road network under a build-operate-transfer scheme
    Yang, H
    Meng, Q
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2002, 36 (07) : 659 - 663