Excess Revenue Allocation for Build-Operate-Transfer Highway Projects

被引:0
|
作者
Song, Jinbo [1 ]
Jin, Lulu [2 ]
Dong, Wanli [2 ]
机构
[1] Dalian Univ Technol, Fac Econ & Management, Hitech Ind Zone, Dalian 116024, Liaoning, Peoples R China
[2] Dalian Univ Technol, Fac Econ & Management, Dalian 116024, Liaoning, Peoples R China
基金
中国国家自然科学基金;
关键词
PUBLIC-PRIVATE PARTNERSHIPS; CAPACITY CHOICE; ROAD NETWORK; REAL OPTION; CONTRACTS; GUARANTEE; EXPERIENCE;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Revenue uncertainty and volatility are problems in BOT highway projects because it is difficult to predict accurately future traffic volume. In high traffic demands, the absence of an excess revenue allocation mechanism leads to the private sector obtaining huge profits, and a high revenue risk to the government and the public. To solve this problem, the Black-Scholes ( B-S) pricing method is used to determine the revenue cap, and a dynamic model is proposed to determine the excess revenue allocation proportion considering the consumer surplus rate and the revenue cap. Finally, the proposed model is illustrated by a numerical example.
引用
收藏
页码:304 / 324
页数:21
相关论文
共 50 条
  • [1] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [2] Financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 808 - 818
  • [3] Traffic Revenue Risk Identification and Assessment in Build-Operate-Transfer Transport Projects in Vietnam
    Truong, Thi My Thanh
    Nguyen, Nga Thi
    CIGOS 2021, EMERGING TECHNOLOGIES AND APPLICATIONS FOR GREEN INFRASTRUCTURE, 2022, 203 : 1563 - 1572
  • [4] Risks and mitigation measures in build-operate-transfer projects
    Bokharey, Syed Kamarul Bakri Syed Ahmad
    Vallyutham, Kalaikumar
    Potty, Narayanan Sambu
    Bakar, Nabilah Abu
    World Academy of Science, Engineering and Technology, 2010, 4 (03): : 81 - 87
  • [5] Alternate financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    Wipadapisut, I
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02): : 205 - 213
  • [6] Build-operate-transfer in infrastructure projects in the United States
    Algarni, Ayed Muhammad
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (10) : 728 - 735
  • [7] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, MAU
    Kaysi, IA
    Schoucair, MS
    CONSTRUCTION 2001: MATERIALS AND CONSTRUCTION, 2001, (1761): : 137 - 147
  • [8] Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts
    Lu, Zhaoyang
    Meng, Qiang
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2023, 172 : 71 - 92
  • [9] Allocation of risks under build-operate-transfer delivery approach for transport infrastructure projects
    Abdul-Malak, Mohamed-Asem U.
    Kaysi, Isam A.
    Schoucair, Marwan S.
    Transportation Research Record, 2001, (1761) : 137 - 147
  • [10] Factors influencing the equity share of build-operate-transfer projects
    De Marco, Alberto
    Mangano, Giulio
    Zou, Xin-Yu
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2012, 2 (01) : 70 - 85