共 50 条
- [4] Applying the lessons learnt in Asset Management around the world to the development of the AMPLE tool COMPUTERS IN RAILWAYS XI: COMPUTER SYSTEM DESIGN AND OPERATION IN THE RAILWAY AND OTHER TRANSIT SYSTEMS, 2008, 103 : 75 - 84
- [8] Characteristics of disasters induced by the Wenchuan 8.0 earthquake and lessons learnt from it PERFORMANCE-BASED DESIGN IN EARTHQUAKE GEOTECHNICAL ENGINEERING - FROM CASE HISTORY TO PRACTICE, 2009, : 295 - 304
- [10] Managing flood disasters on the built environment in the rural communities of Zimbabwe: Lessons learnt JAMBA-JOURNAL OF DISASTER RISK STUDIES, 2018, 10