Real-Time Dispatch for Multi-Unit Hydroelectric Plants With AC Optimal Power Flow: The Case of the Santo Antonio System

被引:5
作者
Filho, Danilo P. C.
Finardi, Erlon C. [1 ]
Aquino, Antonio F. C.
机构
[1] Univ Fed Santa Catarina, Dept Elect & Elect Engn, BR-88040900 Florianopolis, SC, Brazil
关键词
Indexes; Load flow; Hydroelectric power generation; Production; Optimization; Real-time systems; Reactive power; optimal scheduling; real-time dispatch; high voltage direct current; Santo Antonio plant; optimal power flow; UNIT; MODEL;
D O I
10.1109/ACCESS.2021.3124041
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The growing demand for green energy has driven the development of large-capacity hydroelectric plants away from load centers. In this setting, one key aspect is constructing electrical networks for efficient power transmission to the primary grid, which is sometimes combined with high-voltage direct-current systems. However, on-site applications based on real-time dispatch problems often do not model AC power flow (ACPF) constraints, partly because of a lack of appealing methods to simultaneously include the dispatch and ACPF operating characteristics. Furthermore, a precise hydropower production function, a priority in this type of problem, can introduce additional complexity, and practical applications commonly sacrifice grid-connection modeling. This paper proposes a technique for incorporating ACPF constraints in real-time hydro dispatch, promoting widespread methods and optimization tools. The proposed strategy is based on mixed-integer quadratic programming that yields convergent electrical variables compatible with the exact ACPF to minimize a compromise between transmission losses and turbined outflow. The testbed is the Santo Antonio system, composed of 50 generating units, 13 power transformers, and 41 buses. Simulations based on real-life data demonstrate the impact of ACPF modeling, achieving consistently reduced losses above 5%, at the cost of a higher processing time.
引用
收藏
页码:149322 / 149337
页数:16
相关论文
共 23 条
[1]  
[Anonymous], 2018, MODULO 10 SUBMODULO
[2]   A decomposition approach for the solution of the unit loading problem in hydroplants [J].
Breton, M ;
Hachem, S ;
Hammadia, A .
AUTOMATICA, 2002, 38 (03) :477-485
[3]   Mixed-integer nonseparable piecewise linear models for the hydropower production function in the Unit Commitment problem [J].
Brito, B. H. ;
Finardi, E. C. ;
Takigawa, F. Y. K. .
ELECTRIC POWER SYSTEMS RESEARCH, 2020, 182
[4]   The Unit Commitment Problem With AC Optimal Power Flow Constraints [J].
Castillo, Anya ;
Laird, Carl ;
Silva-Monroy, Cesar A. ;
Watson, Jean-Paul ;
O'Neill, Richard P. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (06) :4853-4866
[5]   Performance evaluation and energy production optimization in the real-time operation of hydropower plants [J].
Cordova, M. M. ;
Finardi, E. C. ;
Ribas, F. A. C. ;
de Matos, V. L. ;
Scuzziato, M. R. .
ELECTRIC POWER SYSTEMS RESEARCH, 2014, 116 :201-207
[6]   Power flow based hydro-thermal-wind scheduling of hybrid power system using sine cosine algorithm [J].
Dasgupta, Koustav ;
Roy, Provas Kumar ;
Mukherjee, Vivekananda .
ELECTRIC POWER SYSTEMS RESEARCH, 2020, 178
[7]   A four-dimensional model of hydro generation for the short-term hydrothermal dispatch problem considering head and spillage effects [J].
Diniz, Andre Luiz ;
Pineiro Maceira, Maria Elvira .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :1298-1308
[8]  
Ebeed M., 2018, CLASSICAL RECENT ASP, V1st
[9]   An overview on formulations and optimization methods for the unit-based short-term hydro scheduling problem [J].
Kong, Jiehong ;
Skjelbred, Hans Ivar ;
Fosso, Olav Bjarte .
ELECTRIC POWER SYSTEMS RESEARCH, 2020, 178
[10]   Multi-Objective Hydrothermal Generation Scheduling and Fuel Dispatch Management considering Liquid Fuel Dispatch Network Modeling [J].
Lasemi, Mohammad Ali ;
Assili, Mohsen ;
Hajizadeh, Amin .
ELECTRIC POWER SYSTEMS RESEARCH, 2020, 187