Advanced flexible automation cell control for aerospace manufacturing

被引:4
作者
Webb, Philip [1 ]
Asif, Seemal [1 ]
Hogger, Susanne [2 ]
Kosche, Thomas [3 ]
Kiernan, Paul [4 ]
机构
[1] Cranfield Univ, Dept Integrated Syst, Cranfield MK43 0AL, Beds, England
[2] MTU Aero Engines GmbH, Dept Mfg Engn & Proc Chains TAFT, Munich, Germany
[3] BCT GmbH, R&D, Dortmund, Germany
[4] Skytek, Aerosp R&D, Dublin, Ireland
基金
英国工程与自然科学研究理事会;
关键词
Aerospace manufacturing; Cell control; Flexible automation;
D O I
10.1108/AEAT-11-2012-0204
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Purpose - This paper aims to describe a new methodology for controlling highly flexible automated manufacturing cells for use in aerospace manufacturing and repair. Design/methodology/approach - The design methodology and rational of the FLEXA control architecture are described along with it implementation and testing. Findings - The trials completed so far show that the level of flexibility required can be achieved both at factory, or enterprise level, and at shop floor level. Practical implications - This work has significant practical implications through its direct applicability for aerospace and other automated manufacturing processes. Originality/value - The originality of the paper lies in the truly flexible nature of the control system described and its ability to mimic traditional cell control architectures but be expanded through the use of virtual Programmable Logic Controller to control any number of cells without the need for significant extra hardware.
引用
收藏
页码:156 / 164
页数:9
相关论文
共 18 条
  • [1] Chryssolouris G, 2006, Manufacturing systems: theory and practice, DOI [10.1007/s10344-004-0044-1, DOI 10.1007/S10344-004-0044-1]
  • [2] Denkena B., 2009, PRODUCTIVITY MANAGEM, V4, P37
  • [3] ElMaraghy HA, 2009, SPRINGER SER ADV MAN, P1, DOI 10.1007/978-1-84882-067-8
  • [4] Flexible and reconfigurable manufacturing systems paradigms
    ElMaraghy, Hoda A.
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2005, 17 (04): : 261 - 276
  • [5] Holonic manufacturing scheduling: architecture, cooperation mechanism, and implementation
    Gou, L
    Luh, PB
    Kyoya, Y
    [J]. COMPUTERS IN INDUSTRY, 1998, 37 (03) : 213 - 231
  • [6] Hartmann J., 2000, AUTOMATED WING PANEL
  • [7] Hogger S., 2012, DURCHGANGIGES DATENM
  • [8] Holden R, 2007, AUTOMATED RIVETING C
  • [9] Adaptive robotic assembly of compliant aero-structure components
    Jayaweera, Nirosh
    Webb, Phil
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2007, 23 (02) : 180 - 194
  • [10] Measurement assisted robotic assembly of fabricated aero-engine components
    Jayaweera, Nirosh
    Webb, Phil
    Johnson, Craig
    [J]. ASSEMBLY AUTOMATION, 2010, 30 (01) : 56 - 65