共 50 条
- [43] Sea ice disaster risk assessment index system based on the life cycle of marine engineering Natural Hazards, 2019, 95 : 445 - 462
- [45] "Integrated Engineering" over the entire life cycle ZKG INTERNATIONAL, 2014, 67 (1-2): : 25 - 25
- [46] Research on the Construction to the Early Warning Ability System for the Urban Disaster Based on the System Theory PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON EMERGENCY MANAGEMENT 2011, 2012, : 76 - 80
- [47] Life-cycle Integrated Management Information System (LMIS) of construction project ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1535 - 1542
- [48] LIFE BAETULO Project: Implementation of an Integrated Early Warning System to cope with urban floods INGENIERIA DEL AGUA, 2023, 27 (02): : 93 - 110
- [50] Research on the System of the Construction Project Life Cycle Cost Risk Management ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2329 - 2332