Optimum phase shifting on inventory-production system to reduce cost and to keep the system stable
被引:0
作者:
Castellanos Ruiz, Jose Hugo
论文数: 0引用数: 0
h-index: 0
机构:
Univ Dist Francisco Jose de Caldas, Elect Engn Coordinat, Bogota, DC, ColombiaUniv Dist Francisco Jose de Caldas, Elect Engn Coordinat, Bogota, DC, Colombia
Castellanos Ruiz, Jose Hugo
[1
]
Gonzales R, Leonardo
论文数: 0引用数: 0
h-index: 0
机构:
Univ Sabana, Ind Engn Fac, Chia, ColombiaUniv Dist Francisco Jose de Caldas, Elect Engn Coordinat, Bogota, DC, Colombia
Gonzales R, Leonardo
[2
]
机构:
[1] Univ Dist Francisco Jose de Caldas, Elect Engn Coordinat, Bogota, DC, Colombia
[2] Univ Sabana, Ind Engn Fac, Chia, Colombia
来源:
2015 WORKSHOP ON ENGINEERING APPLICATIONS - INTERNATIONAL CONGRESS ON ENGINEERING (WEA)
|
2015年
Sometimes is not possible to dispose enough area to store raw materials and finished products on a shared area. In order to reduce costs in this restricted area, it must apply phase shifting between start production and raw material arrival but not any quantity of phase shifting if system stability is required. Considering inventory-production system as a closed loop system controlled by phase, this paper demonstrate that phase shifting allowed is obtained through applying the phase locked 100p(PLL) of telecommunication theory as an alternative to analytical(maximum-minimum) with restrictions method.