Mechanism of electrochemical chloride removal

被引:111
作者
Elsener, B. [1 ]
Angst, U. [1 ]
机构
[1] ETH Honggerberg, ETH Zurich, Inst Bldg Mat IfB, CH-8093 Zurich, Switzerland
关键词
reinforced concrete; galvanostatic; polarization; repassivation;
D O I
10.1016/j.corsci.2007.05.019
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents the first laboratory results obtained from continuous monitoring of the free chloride content in concrete blocks during electrochemical chloride removal (ECR). Chloride sensitive electrodes have been embedded at different depths in concrete specimens and the free chloride concentration was measured during ECR. The total chloride content was determined prior to and after the electrochemical treatment. Time and space resolved data on the removal of chloride ions and information concerning the relationship between bound and free chloride was obtained. Due to the removal of free chloride during the treatment, bound chloride is dissolved in order to re-establish the equilibrium between bound and free chlorides. The rate of release of bound chloride is slow compared to the rate of chloride removal and thus the ECR process quickly becomes inefficient. Current off periods allow the system to re-establish the equilibrium between bound and free chlorides. Subsequently, the process is efficient again. The results are discussed with respect to treatment efficiency, treatment procedure and current distribution. It is concluded that the ECR process is currently applied in an inefficient manner and the charge required for the desalination can be reduced significantly. This is also of interest with regard to the risk of undesirable side-effects that currently limit the use of ECR. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:4504 / 4522
页数:19
相关论文
共 33 条
[1]  
ALONSO C, 2001, COST 521 P 2001 WORK, P271
[2]  
ANGST U, 2006, P 2 INT C CONCR SOL, P242
[3]  
ANGST U, 2005, THESIS I BUILDING MA
[4]  
Bertolini L, 2004, Corrosion of Steel in Concrete: Prevention, Diagnosis, Repair
[5]  
BUENFELD NR, 1998, J MAT CIVIL ENG, V10
[6]   Electrochemical removal of chlorides - Modelling of the extraction, resulting profiles and determination of the efficient time of treatment [J].
Castellote, M ;
Andrade, C ;
Alonso, C .
CEMENT AND CONCRETE RESEARCH, 2000, 30 (04) :615-621
[7]   Bond degradation due to the desalination process [J].
Chang, JJ .
CONSTRUCTION AND BUILDING MATERIALS, 2003, 17 (04) :281-287
[8]  
CIGNA R, 1993, 521 COST
[9]   Chloride binding capacity of various hydrated cement paste systems [J].
Delagrave, A ;
Marchand, J ;
Ollivier, JP ;
Julien, S ;
Hazrati, K .
ADVANCED CEMENT BASED MATERIALS, 1997, 6 (01) :28-35
[10]   Non destructive determination of the free chloride content in cement based materials [J].
Elsener, B ;
Zimmermann, L ;
Böhni, H .
MATERIALS AND CORROSION-WERKSTOFFE UND KORROSION, 2003, 54 (06) :440-446