共 103 条
- [1] Process simulation of a dual-stage Selexol unit for pre-combustion carbon capture at an IGCC power plant [J]. 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 1751 - 1755
- [6] Ejector integration for the cost effective design of the Selexol™ process [J]. ENERGY, 2018, 162 : 380 - 392
- [7] A Numerical investigation of municipal solid waste gasification using aspen plus [J]. 10TH INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING (ICME 2013), 2014, 90 : 710 - 717
- [8] Performance Analysis of an Integrated Fixed Bed Gasifier Model for Different Biomass Feedstocks [J]. ENERGIES, 2013, 6 (12): : 6508 - 6524
- [9] Bellotti Daria, 2019, E3S Web of Conferences, V113, DOI 10.1051/e3sconf/201911301013