Uncertainty-complexity trade-offs for sensor compensation design

被引:0
作者
Gubian, A. [1 ]
Marconato, A. [1 ]
Boni, A. [1 ]
Petri, D. [1 ]
机构
[1] Univ Trent, Dept Informat & Commun Teachnol, Via Sommarive 14, I-38050 Trento, Italy
来源
2007 IEEE INTERNATIONAL WORKSHOP ON ADVANCED METHODS FOR UNCERTAINTY ESTIMATION IN MEASUREMENT | 2007年
关键词
sensor compensation; support vector machines; multiobjective optimization;
D O I
10.1109/AMUEM.2007.4362584
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this work we focus on the design of reduced-complexity sensor compensation modules based on learning-from-examples techniques. A Multi-Objective Optimization design framework is proposed, where system complexity and compensation uncertainty are considered as two conflicting costs to be jointly minimized. In addition, suitable statistical techniques are applied to cope with the variability in the uncertainty estimation arising from the limited availability of data at design time. Experimental results on a synthetic benchmark are provided to show the validity of the proposed methodology.
引用
收藏
页码:127 / +
页数:3
相关论文
共 50 条
[31]   Optimizing the cost, LEED credits, and time trade-offs using a genetic algorithmic model [J].
Kumar, Shantanu ;
Mehany, Mohammed S. Hashem M. .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (05) :596-608
[32]   Resolving Contrast and Detail Trade-Offs in Image Processing with Multi-Objective Optimization [J].
Molina-Perez, Daniel ;
Rojas-Lopez, Alam Gabriel .
MATHEMATICAL AND COMPUTATIONAL APPLICATIONS, 2024, 29 (06)
[34]   Generation of surrogate models of Pareto-optimal performance trade-offs of planar inductors [J].
M. Kotti ;
R. González-Echevarría ;
F. V. Fernández ;
E. Roca ;
J. Sieiro ;
R. Castro-López ;
M. Fakhfakh ;
J. M. López-Villegas .
Analog Integrated Circuits and Signal Processing, 2014, 78 :87-97
[35]   KUHN-TUCKER MULTIPLIERS AS TRADE-OFFS IN MULTIOBJECTIVE DECISION-MAKING ANALYSIS [J].
HAIMES, YY ;
CHANKONG, V .
AUTOMATICA, 1979, 15 (01) :59-72
[36]   Optimal Trade-Offs between Construction Cost and Traffic Delay for Highway Work Zones [J].
Abdelmohsen, Ahmed Z. ;
El-Rayes, Khaled .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (07)
[37]   Economic-environmental trade-offs in long-term airline fleet planning [J].
Rosskopf, Michael ;
Lehner, Stephan ;
Gollnick, Volker .
JOURNAL OF AIR TRANSPORT MANAGEMENT, 2014, 34 :109-115
[38]   Sustainable production through balancing trade-offs among three metrics in flow shop scheduling [J].
Abedini, Amin ;
Li, Wei ;
Badurdeen, Fazleena ;
Jawahir, I. S. .
26TH CIRP CONFERENCE ON LIFE CYCLE ENGINEERING (LCE), 2019, 80 :209-214
[39]   Exploring Environmental and Economic Trade-offs Associated with Aggregate Recycling from Decommissioned Forest Roads [J].
Matthew P. Thompson ;
John Sessions .
Environmental Modeling & Assessment, 2010, 15 :419-432
[40]   Exploring Environmental and Economic Trade-offs Associated with Aggregate Recycling from Decommissioned Forest Roads [J].
Thompson, Matthew P. ;
Sessions, John .
ENVIRONMENTAL MODELING & ASSESSMENT, 2010, 15 (06) :419-432