Automated Telescope Scheduling

被引:0
|
作者
Gharote, M. S. [1 ]
Deshpande, A. M. [1 ]
Lodha, S. P. [1 ]
Kantharia, N. G.
Wadadekar, Y. G.
Katore, S. N.
Rao, A. Pramesh
机构
[1] Tata Res Dev & Design Ctr TCS Ltd, Pune, Maharashtra, India
关键词
D O I
暂无
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
The Giant Metrewave Radio Telescope, commonly known as GMRT, is the world's largest low frequency radio telescope. Being a rare resource, efficient planning of GMRT is needed. Planning consists of scheduling a pre-selected large collection of scientific proposals up to half a year in advance. Scheduling becomes complex due to the variety of astronomical, equipment and logistical constraints. The goal is to schedule each observation to appropriate time slots so that constraints violation is minimized. We have developed a scheduler software named GSCHED to assist in scheduling and to increase the utilization of GMRT.
引用
收藏
页码:438 / +
页数:3
相关论文
共 50 条
  • [31] Automated Negotiation for Decentralised Scheduling
    Liu, Haixiao
    Shao, Zhichao
    Tan, Xianglin
    2016 3RD INTERNATIONAL CONFERENCE ON MECHANICS AND MECHATRONICS RESEARCH (ICMMR 2016), 2016, 77
  • [32] AUTOMATED ASSEMBLY SCHEDULING - A REVIEW
    LITTLE, D
    HEMMINGS, A
    COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1994, 7 (01): : 51 - 61
  • [33] Scheduling algorithms for automated traffic
    Giridhar, A
    Kumar, PR
    2004 43RD IEEE CONFERENCE ON DECISION AND CONTROL (CDC), VOLS 1-5, 2004, : 2754 - 2759
  • [34] A GUIDE TO AUTOMATED CLASS SCHEDULING
    STOCKMAN, JW
    DATA PROCESSING, 1964, 6 (10): : 30 - 33
  • [35] Scheduling in Targeted Transient Surveys and a New Telescope for CHASE
    Forster, Francisco
    Lopez, Nicolas
    Maza, Jose
    Kubanek, Petr
    Pignata, G.
    ADVANCES IN ASTRONOMY, 2010, 2010
  • [36] Service mode scheduling at the ESO very large telescope
    Silva, DR
    OBSERVATORY OPERATIONS TO OPTIMIZE SCIENTIFIC RETURN III, 2002, 4844 : 94 - 103
  • [37] Optimization of telescope scheduling -: Algorithmic research and scientific policy
    de Castro, AIG
    Yáñez, J
    ASTRONOMY & ASTROPHYSICS, 2003, 403 (01) : 357 - 367
  • [38] Spitzer Space Telescope observatory planning and scheduling team
    Barba, Stephen J.
    Garcia, Lisa J.
    Levine, Deborah A.
    McElroy, Douglas B.
    Mittman, David S.
    O'Linger, JoAnn C.
    Tyler, Steven R.
    2005 IEEE Aerospace Conference, Vols 1-4, 2005, : 432 - 446
  • [39] Scheduling for Robonet-1 homogenous telescope network
    Fraser, S. N.
    ASTRONOMISCHE NACHRICHTEN, 2006, 327 (08) : 779 - 782
  • [40] SCHEDULING WITH NEURAL NETWORKS - THE CASE OF THE HUBBLE SPACE TELESCOPE
    JOHNSTON, MD
    ADORF, HM
    COMPUTERS & OPERATIONS RESEARCH, 1992, 19 (3-4) : 209 - 240