Automated Telescope Scheduling

被引:0
|
作者
Gharote, M. S. [1 ]
Deshpande, A. M. [1 ]
Lodha, S. P. [1 ]
Kantharia, N. G.
Wadadekar, Y. G.
Katore, S. N.
Rao, A. Pramesh
机构
[1] Tata Res Dev & Design Ctr TCS Ltd, Pune, Maharashtra, India
关键词
D O I
暂无
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
The Giant Metrewave Radio Telescope, commonly known as GMRT, is the world's largest low frequency radio telescope. Being a rare resource, efficient planning of GMRT is needed. Planning consists of scheduling a pre-selected large collection of scientific proposals up to half a year in advance. Scheduling becomes complex due to the variety of astronomical, equipment and logistical constraints. The goal is to schedule each observation to appropriate time slots so that constraints violation is minimized. We have developed a scheduler software named GSCHED to assist in scheduling and to increase the utilization of GMRT.
引用
收藏
页码:438 / +
页数:3
相关论文
共 50 条
  • [1] Greedy search algorithm used in the automated scheduling of Hubble Space Telescope activities
    Samson, RJ
    OBSERVATORY OPERATIONS TO OPTIMIZE SCIENTIFIC RETURN, 1998, 3349 : 282 - 290
  • [2] Robotic telescope scheduling: The Liverpool Telescope experience
    Fraser, SN
    Steele, LA
    OPTIMIZING SCIENTIFIC RETURN FOR ASTRONOMY THROUGH INFORMATION TECHNOLOGIES, 2004, 5493 : 331 - 340
  • [3] THE AUTOMATED PATROL TELESCOPE
    COCHRANE, JW
    MITCHELL, P
    PAYNE, PW
    STOREY, JWV
    WEBSTER, BL
    IAU SYMPOSIA, 1986, (118): : 85 - 86
  • [4] Taiwan Automated Telescope Network
    Chou, Dean-Yi
    Sun, Ming-Tsung
    Fernandez, Javier Fernandez
    Wang, Li-Han
    Jimenez, Antonio
    Serebryanskiy, Alexander
    Ehgamberdiev, Shuhrat
    ADVANCES IN ASTRONOMY, 2010, 2010
  • [5] Automated telescope for variability studies
    Ganesh, S.
    Baliyan, K. S.
    Chandra, S.
    Joshi, U. C.
    Kalyaan, A.
    Mathur, S. N.
    PROCEEDINGS OF THE 31ST MEETING OF THE ASTRONOMICAL SOCIETY OF INDIA, 2013, 2013, : 99 - 99
  • [6] An automated DIMM telescope for Antarctica
    Dopita, MA
    Wood, PR
    Hovey, GR
    PUBLICATIONS ASTRONOMICAL SOCIETY OF AUSTRALIA, 1996, 13 (01): : 39 - 43
  • [7] Observation scheduling tools for Subaru Telescope
    Sasaki, T
    Kosugi, G
    Hawkins, R
    Kawai, JA
    Kusumoto, T
    OPTIMIZING SCIENTIFIC RETURN FOR ASTRONOMY THROUGH INFORMATION TECHNOLOGIES, 2004, 5493 : 367 - 372
  • [8] Observation scheduling scheme for Subaru telescope
    Sasaki, T
    Kosugi, G
    Kawai, JA
    Kusumoto, T
    Koura, N
    Hawkins, R
    Kramer, L
    Krueger, AP
    Miller, GE
    ADVANCED TELESCOPE AND INSTRUMENTATION CONTROL SOFTWARE, 2000, 4009 : 350 - 354
  • [9] Reactive scheduling of the UK infrared telescope
    Davies, JK
    NEW OBSERVING MODES FOR THE NEXT CENTURY, 1996, 87 : 76 - 80
  • [10] Observation scheduling scheme of the SUBARU telescope
    Sasaki, T
    Kosugi, G
    Takata, T
    Kawai, JA
    NEW OBSERVING MODES FOR THE NEXT CENTURY, 1996, 87 : 196 - 199