Transient States of Cyclic Production Planning and Control

被引:27
作者
Krenczyk, Damian [1 ]
Skolud, Bozena [1 ]
机构
[1] Silesian Tech Univ, Fac Mech Engn, PL-44100 Gliwice, Poland
来源
ENGINEERING SOLUTIONS AND TECHNOLOGIES IN MANUFACTURING | 2014年 / 657卷
关键词
production planning; transient state; manufacturing systems; management; constraint satisfaction; scheduling; CONSTRAINT SATISFACTION; SCHEDULING PROBLEMS;
D O I
10.4028/www.scientific.net/AMM.657.961
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The method for determining dispatching rules for transient phases, based on designation of a local dispatching rule for steady state, which determines the rest of its components has been presented in the paper. The algorithm for determining the transient rules has been presented and dependencies resulting from the presented sufficient conditions have been formulated. For the proposed transitional-rules generation algorithm the simulation model has been prepared. Simulation experiments to verify the correctness and effectiveness of the presented method have been conducted. The experiments have been prepared for input data describing the production system and the production order. In the verification process Enterprise Dynamics computer simulation system has been used. The results were compared with the results obtained for transitional phases realized through the S0 state of the production system.
引用
收藏
页码:961 / 965
页数:5
相关论文
共 12 条
  • [1] Constraint satisfaction for planning and scheduling problems
    Bartak, Roman
    Salido, Miguel A.
    [J]. CONSTRAINTS, 2011, 16 (03) : 223 - 227
  • [2] Bocewicz G, 2011, LECT NOTES ARTIF INT, V6922, P448, DOI 10.1007/978-3-642-23935-9_44
  • [3] Bocewicz G, 2009, LECT NOTES ARTIF INT, V5914, P310, DOI 10.1007/978-3-642-10488-6_31
  • [4] A new algorithm for cyclic scheduling and design of multipurpose batch plants
    Heo, SK
    Lee, KH
    Lee, HK
    Lee, IB
    Park, JH
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (04) : 836 - 846
  • [5] Recurrent neural network approach for cyclic job shop scheduling problem
    Kechadi, M-Tahar
    Low, Kok Seng
    Goncalves, G.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (04) : 689 - 699
  • [6] Krenczyk D., 2004, CO MAT TECH 2004 P 1, P684
  • [7] Krenczyk D, 2012, LECT NOTES COMPUT SC, V7209, P274
  • [8] Krenczyk D, 2011, LECT NOTES ARTIF INT, V6679, P397, DOI 10.1007/978-3-642-21222-2_48
  • [9] Construction Scheduling Using the Constraint Satisfaction Problem Method
    Lorterapong, Pasit
    Ussavadilokrit, Mongkol
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (04) : 414 - 422
  • [10] Skolud B., 2012, J MACHINE ENG, V12, P3