Structural equation model for assessing impacts of contractor's performance on project success

被引:170
作者
Doloi, Hemanta [1 ]
Iyer, K. C. [2 ]
Sawhney, Anil [2 ]
机构
[1] Univ Melbourne, Fac Architecture Bldg & Planning, Melbourne, Vic 3010, Australia
[2] Indian Inst Technol, Dept Civil Engn, New Delhi 110016, India
关键词
Prequalification; Contractor selection; Project performance; Structural model; SELECTION PROCESS; SYSTEM;
D O I
10.1016/j.ijproman.2010.05.007
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Contactor's expertise and performance play a significant role in successful delivery of a project. While clients strive hard to make the best decisions in selecting the right contractor for the right job, a clear understanding of the underlying attributes associated with contractors' selection in the context of achieving, successful project outcomes is critical. In an attempt to understand these pre-emptive qualification criteria and their links to contractors' performance on a project, a hierarchical structural model is established. By employing the structural equation modelling technique, the model adapts a total of 29 technical attributes across five confirmatory factors namely, soundness of business and workforce (SBW), planning and control (PC), quality performance (QP), past performance (PP) and overall project success (OPS). Based on the survey data collected across medium size construction projects in Australia, the results of the model confirmed that technical planning and controlling expertise of contractor is key in achieving success on projects. With a clear understanding of the significance of these factors in the context of contractors' performance, these findings could potentially contribute to the development of a company's procedures or to enhance existing knowledge of contractor prequalification practices. (c) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:687 / 695
页数:9
相关论文
共 26 条
[1]  
Aikin L.S., 1994, J CONSULT CLIN PSYCH, V62, P488
[2]   Factors affecting contractors' risk of cost overburden [J].
Akinci, B ;
Fischer, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (01) :67-76
[3]   Performance modeling for contractor selection [J].
Alarcón, LF ;
Mourgues, C .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (02) :52-60
[4]   Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES) [J].
Arslan, Gokhan ;
Kivrak, Serkan ;
Birgonul, M. Talat ;
Dikmen, Irem .
AUTOMATION IN CONSTRUCTION, 2008, 17 (04) :480-488
[5]  
Burnett M., 2009, CONSTRUCTION MANAGEM, V2009, P17
[6]  
Cheng EddieW. L., 2004, CONSTRUCTION MANAGEM, V22, P1021, DOI DOI 10.1080/0144619042000202852
[7]  
Doloi H., 2009, CONSTRUCTION MANAGEM, V19, P1245
[8]  
Fong P.e., 2000, Construction Management and Economics, V18, P547, DOI [DOI 10.1080/014461900407356, 10.1080/014461900407356]
[9]  
Greenwood D., 2001, CONSTR MANAG ECON, V19, P5, DOI [10.1080/01446190010003380, DOI 10.1080/01446190010003380]
[10]  
Holt G. D., 1998, International Journal of Project Management, V16, P153, DOI 10.1016/S0263-7863(97)00035-5