Blasting excavation and stability control technology for ultra-high steep rock slope of hydropower engineering in China: a review

被引:19
作者
Deng Ke [1 ,2 ]
Chen Ming [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan, Hubei, Peoples R China
[2] Wuhan Univ, Key Lab Rock Mech Hydraul Struct Engn, Minist Educ, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Rock slope; stability; blasting excavation; reinforcement measure; safety monitor; INDUCED DAMAGE; SIMULATION; MODEL; REINFORCEMENT; MECHANISM; VIBRATION; RIVER; SITE; MINE;
D O I
10.1080/22797254.2020.1752811
中图分类号
TP7 [遥感技术];
学科分类号
081102 ; 0816 ; 081602 ; 083002 ; 1404 ;
摘要
China has entered a high-speed construction period on hydropower engineering since the late 20th century. Blasting is the major way for rock excavation on large projects, especially for ultra-high steep rock slope. Due to the constraints of topography and geomorphology, requirements on blasting excavation and stability of the reserved rock after blasting are strict for ultra-high steep rock slope. Thus, blasting and reinforcement technology have caused engineer's attention. This article reviewed the blasting excavation and stability control technology of Chinese hydropower engineering slope and discussed the progress and limitation. Slope on the left bank of Jinping I hydropower station was selected as a case study to reflect the blasting excavation and stability control technology in a rather challenging hydropower engineering slope. The blasting excavation and stability control technology involved in this article can give some reference for other similar engineering projects.
引用
收藏
页码:92 / 106
页数:15
相关论文
共 52 条
[21]  
[李宁 LI Ning], 2007, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V26, P36
[22]   Large Deformation Analysis of a High Steep Slope Relating to the Laxiwa Reservoir, China [J].
Lin, Peng ;
Liu, Xiaoli ;
Hu, Senying ;
Li, Pujian .
ROCK MECHANICS AND ROCK ENGINEERING, 2016, 49 (06) :2253-2276
[23]   Cracking, stability and slope reinforcement analysis relating to the Jinping dam based on a geomechanical model test [J].
Lin, Peng ;
Liu, Xiaoli ;
Zhou, Weiyuan ;
Wang, Renkun ;
Wang, Shanyong .
ARABIAN JOURNAL OF GEOSCIENCES, 2015, 8 (07) :4393-4410
[24]  
Ling HI, 1997, INT J ROCK MECH MIN, V34, P1021, DOI 10.1016/S1365-1609(97)80011-1
[25]   Design and optimization for bench blast based on Voronoi diagram [J].
Liu, Jun ;
Sun, Pinyu ;
Liu, Fangxue ;
Zhao, Mingsheng .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2014, 66 :30-40
[26]   Slope stability analysis based on a multigrid method using a nonlinear 3D finite element model [J].
Liu Y. ;
He Z. ;
Li B. ;
Yang Q. .
Frontiers of Structural and Civil Engineering, 2013, 7 (1) :24-31
[27]   An introduction to Chinese safety regulations for blasting vibration [J].
Lu, Wen-bo ;
Luo, Yi ;
Chen, Ming ;
Shu, Da-qiang .
ENVIRONMENTAL EARTH SCIENCES, 2012, 67 (07) :1951-1959
[28]   Dynamic response of rock mass induced by the transient release of in-situ stress [J].
Lu, Wenbo ;
Yang, Jianhua ;
Yan, Peng ;
Chen, Ming ;
Zhou, Chuangbing ;
Luo, Yi ;
Jin, Li .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2012, 53 :129-141
[29]   The excavation disturbed zone (EDZ) at Kiirunavaara mine, Sweden -: by seismic measurements [J].
Malmgren, L. ;
Saiang, D. ;
Toyra, J. ;
Bodare, A. .
JOURNAL OF APPLIED GEOPHYSICS, 2007, 61 (01) :1-15
[30]   An update to the strain-based approach to pit wall failure prediction, and a justification for slope monitoring [J].
Newcomen, W. ;
Dick, G. .
JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (05) :379-385