Blasting excavation and stability control technology for ultra-high steep rock slope of hydropower engineering in China: a review

被引:17
作者
Deng Ke [1 ,2 ]
Chen Ming [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan, Hubei, Peoples R China
[2] Wuhan Univ, Key Lab Rock Mech Hydraul Struct Engn, Minist Educ, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Rock slope; stability; blasting excavation; reinforcement measure; safety monitor; INDUCED DAMAGE; SIMULATION; MODEL; REINFORCEMENT; MECHANISM; VIBRATION; RIVER; SITE; MINE;
D O I
10.1080/22797254.2020.1752811
中图分类号
TP7 [遥感技术];
学科分类号
081102 ; 0816 ; 081602 ; 083002 ; 1404 ;
摘要
China has entered a high-speed construction period on hydropower engineering since the late 20th century. Blasting is the major way for rock excavation on large projects, especially for ultra-high steep rock slope. Due to the constraints of topography and geomorphology, requirements on blasting excavation and stability of the reserved rock after blasting are strict for ultra-high steep rock slope. Thus, blasting and reinforcement technology have caused engineer's attention. This article reviewed the blasting excavation and stability control technology of Chinese hydropower engineering slope and discussed the progress and limitation. Slope on the left bank of Jinping I hydropower station was selected as a case study to reflect the blasting excavation and stability control technology in a rather challenging hydropower engineering slope. The blasting excavation and stability control technology involved in this article can give some reference for other similar engineering projects.
引用
收藏
页码:92 / 106
页数:15
相关论文
共 52 条
  • [1] [Anonymous], 1990, P INT S ROCK JOINTS
  • [2] [Anonymous], 2016, APPL RES COMPUTERS, DOI DOI 10.3969/J.ISSN.1006-9348.2016.07.001
  • [3] Static and dynamic simulation of a 700-m high rock slope in western Norway
    Bhasin, R
    Kaynia, AM
    [J]. ENGINEERING GEOLOGY, 2004, 71 (3-4) : 213 - 226
  • [4] Bishop A.W., 1955, Geotechnique, V5, P7, DOI [10.1680/geot.1955.5.1.7, DOI 10.1680/GEOT.1955.5.1.7]
  • [5] Slope stability analysis and discontinuous slope failure simulation by elasto-plastic smoothed particle hydrodynamics (SPH)
    Bui, H. H.
    Fukagawa, R.
    Sako, K.
    Wells, J. C.
    [J]. GEOTECHNIQUE, 2011, 61 (07): : 565 - 574
  • [6] Cawood FT, 2006, J S AFR I MIN METALL, V106, P495
  • [7] Blasting Excavation Induced Damage of Surrounding Rock Masses in Deep-buried Tunnels
    Chen, M.
    Lu, W. B.
    Yan, P.
    Hu, Y. G.
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (02) : 933 - 942
  • [8] [陈清运 Chen Qingyun], 2011, [爆破, Blasting], V28, P35
  • [9] Geomechanical model test on dam stability and application to Jinping High arch dam
    Chen, Yuan
    Zhang, Lin
    Yang, Baoquan
    Dong, Jianhua
    Chen, Jianye
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2015, 76 : 1 - 9
  • [10] Cundall P A., 1987, Distinct element models of rock and soil structure