AN OBSERVATIONAL STUDY OF THE PRODUCTIVITY OF FORMWORK IN BUILDING CONSTRUCTION

被引:0
作者
Mine, Naoto [1 ]
Wai, Soon Han [1 ]
Lim, Ting Chuan [1 ]
机构
[1] Univ Tunku Abdul Rahman, Dept Construct Management, Petaling Jaya, Malaysia
来源
IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT | 2015年
关键词
Reinforced concrete construction; Productivity; Work study; Work process; Process analysis; Man-hours; Unit requirement;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Formwork is one of the essential elements of construction work in traditional reinforced concrete building construction. In addition to being complicated work, formwork is labor intensive and requires numerous, highly-skilled formwork carpenters. Labor accounts to over 50% of the cost of formwork, a large percentage relative to other types of basic construction work. To increase formwork efficiency, it is necessary to improve work methods. While productivity of formwork has been the focus of previous studies, effective work data such as detailed work processes or man-hours were not sufficiently obtained. This paper reports on an observational study carried out on fifteen building construction projects using work-study techniques, specifically work processes, man-hours, and number of workers in each work process. It highlights the process analyses of a typical formwork construction project and discusses the results of a statistical analysis of labor productivity related to all construction projects.
引用
收藏
页码:1127 / 1132
页数:6
相关论文
共 50 条
  • [41] Systematic Review of the Literature on Construction Productivity
    Rathnayake, Asitha
    Middleton, Campbell
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (06)
  • [42] An exploratory study of the relationship between construction workforce physical strain and task level productivity
    Gatti, Umberto C.
    Migliaccio, Giovanni C.
    Bogus, Susan M.
    Schneider, Suzanne
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (06) : 548 - 564
  • [43] No observational evidence for diversity enhancing productivity in Mediterranean shrublands
    Wardle D.A.
    Oecologia, 2001, 129 (4) : 620 - 621
  • [44] No observational evidence for diversity enhancing productivity in Mediterranean shrublands
    Wardle, DA
    OECOLOGIA, 2001, 129 (04) : 620 - 621
  • [45] Library Service Productivity in Building Learning Communities
    Suwena, Kadek Rai
    Indrayani, Luh
    Atidira, Rahutama
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON TOURISM, ECONOMICS, ACCOUNTING, MANAGEMENT, AND SOCIAL SCIENCE (TEAMS 2018), 2018, 69 : 262 - 267
  • [46] Optimization of productivity in the rehabilitation of building linked to BIM
    Nabil, Boulkenafet
    Khaled, Boudjellal
    Mohamed, Bouabaz
    ADVANCES IN COMPUTATIONAL DESIGN, AN INTERNATIONAL JOURNAL, 2023, 8 (02): : 179 - 190
  • [47] Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications
    Manoharan, Kesavan
    Dissanayake, Pujitha
    Pathirana, Chintha
    Deegahawature, Dharsana
    Silva, Renuka
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 339 - 350
  • [48] Modeling the variability of labor productivity in masonry construction
    Department of Business Administration, University of Jordan, Amman
    11942, Jordan
    不详
    11942, Jordan
    不详
    11931, Jordan
    不详
    Jordan J. Civil Eng., 2009, 3 (197-212):
  • [49] Causal Relationships of Factors Influencing Construction Productivity
    Besklubova, Svetlana
    Zhang, Xueqing
    2017 4TH ICSSH CONFERENCE ON ECONOMIC DEVELOPMENT AND MANAGEMENT (ICSSH-EDM 2017), 2017, 99 : 183 - 186
  • [50] Construction Change: Likelihood, Severity, and Impact on Productivity
    Ibbs, William
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2012, 4 (03) : 67 - 73