Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects

被引:7
作者
Khalilzadeh, Mohammad [1 ,2 ]
Balafshan, Rose [3 ]
Hafezalkotob, Ashkan [4 ]
机构
[1] CENTRUM Catolica Grad Business Sch, Lima, Peru
[2] Pontificia Univ Catolica Peru, Lima, Peru
[3] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[4] Islamic Azad Univ, Fac Ind Engn, South Tehran Branch, Tehran, Iran
关键词
Risk management; FMEA; Risk assessment; Mathematical programming; Fuzzy sets; Multi-criteria decision-making;
D O I
10.1108/JEDT-01-2020-0020
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. Design/methodology/approach This paper consists of several sections. In the first section, 19 common potential risks in the projects of Pars Oil and Gas Company were finalized in six groups using the Lawshe validation method. These factors were identified through previous literature review and interviews with experts. Then, using the "best-worst multi-criteria decision-making" method, the study measured the weights associated with the performance evaluation indicators of each risk. Consequently, failure mode and effects analysis (FMEA) and the grey relational analysis (GRA)-VIKOR mixed method were used to rank and determine the critical risks. Finally, to assign response strategies to each critical risk, a zero-one multi-objective mathematical programming model was proposed and developed Epsilon-constraint method was used to solve it. Findings Given the typical constraints of projects which are time, cost and quality, of the projects that companies are often faced with, this study presents the identified risks of oil and gas projects to the managers of the oil and gas company in accordance with the priority given in the present research and the response to each risk is also suggested to be used by managers based on their organizational circumstances. Originality/value This study aims at qualitative management of cost risks of oil and gas projects (case study of Pars Oil and Gas Company) by combining FMEA, best worst and GRA-VIKOR methods under fuzzy environment and Epsilon constraints. According to studies carried out in previous studies, the simultaneous management of quantitative and qualitative cost of risk of oil and gas projects in Iran has not been carried out and the combination of these methods has also been innovated.
引用
收藏
页码:1997 / 2016
页数:20
相关论文
共 21 条
[1]   The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies [J].
Adeleke, A. Q. ;
Bahaudin, A. Y. ;
Kamaruddeen, A. M. ;
Bamgbade, J. A. ;
Salimon, Maruf Gbadebo ;
Khan, Muhammad Waris Ali ;
Sorooshian, Shahryar .
SAFETY AND HEALTH AT WORK, 2018, 9 (01) :115-124
[2]   COMPREHENSIVE RISK MANAGEMENT USING FUZZY FMEA AND MCDA TECHNIQUES IN HIGHWAY CONSTRUCTION PROJECTS [J].
Ahmadi, Mohsen ;
Behzadian, Kourosh ;
Ardeshir, Abdollah ;
Kapelan, Zoran .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (02) :300-310
[3]  
Al Subaih A., 2015, Oil and Gas Facilities, V4, P64, DOI [DOI 10.2118/171722-PA, 10.2118/171722-pa,04):064-077]
[4]  
Briel E., 2013, Oil and Gas Facilities, DOI [10.2118/0413-0019-OGF, DOI 10.2118/0413-0019-OGF]
[5]   Extensions of the TOPSIS for group decision-making under fuzzy environment [J].
Chen, CT .
FUZZY SETS AND SYSTEMS, 2000, 114 (01) :1-9
[6]   Impact of risk management on project performance: the importance of soft skills [J].
de Carvalho, Marly Monteiro ;
Rabechini Junior, Roque .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (02) :321-340
[7]  
Denney D., 2006, Journal of Petroleum Technology, V58, P68
[8]   Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model [J].
Ebrahimnejad, Sadoullah ;
Mousavi, Seyed Meysam ;
Seyrafianpour, Hamed .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (01) :575-586
[9]   Risk evaluation using a novel hybrid method based on FMEA, extended MULTIMOORA, and AHP methods under fuzzy environment [J].
Fattahi, Reza ;
Khalilzadeh, Mohammad .
SAFETY SCIENCE, 2018, 102 :290-300
[10]   Risk management in small construction projects in Singapore: Status, barriers and impact [J].
Hwang, Bon-Gang ;
Zhao, Xianbo ;
Toh, Li Ping .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (01) :116-124