Resequencing of mixed-model assembly lines: Survey and research agenda

被引:73
作者
Boysen, Nils [1 ]
Scholl, Armin [2 ]
Wopperer, Nico [1 ]
机构
[1] Univ Jena, Lehrstuhl Operat Management, D-07743 Jena, Germany
[2] Univ Jena, Lehrstuhl Management Sci, D-07743 Jena, Germany
关键词
Mixed-model assembly line; Resequencing; Survey; DIVISION-OF-LABOR; JIT SEQUENCING PROBLEM; RESPONSE THRESHOLDS; GENETIC ALGORITHMS; LEVEL SCHEDULES; SEARCH; OBJECTIVES; SYSTEMS; SETUPS;
D O I
10.1016/j.ejor.2011.08.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Nowadays, mixed-model assembly lines are applied in a wide range of industries to mass-produce customized products to order, e.g., in automobile industry. An important decision problem in this context receiving a lot of attention from researchers and practitioners is the sequencing problem, which decides on the succession of workpieces launched down the line. However, if multiple departments with diverging sequencing objectives are to be passed or unforeseen disturbances like machine breakdowns or material shortages occur, a resequencing of a given production sequence often becomes equally essential. This paper reviews existing research on resequencing in a mixed-model assembly line context. Important problem settings, alternative buffer configurations, and resulting decision problems are described. Finally, future research needs are identified as some relevant real-world resequencing settings have not been dealt with in literature up to now. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:594 / 604
页数:11
相关论文
共 80 条
[1]   Set-up coordination between two stages of a supply chain [J].
Agnetis, A ;
Detti, P ;
Meloni, C ;
Pacciarelli, D .
ANNALS OF OPERATIONS RESEARCH, 2001, 107 (1-4) :15-32
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[3]  
[Anonymous], 1999, Swarm Intelligence
[4]  
Balakrishnan H., 2006, COLLECTION TECHNICAL, V4, P2175, DOI [10.2514/6.2006-6320, DOI 10.2514/6.2006-6320]
[5]  
Bergen M. E., 2001, Advances in Artificial Intelligence. 14th Biennial Conference of the Canadian Society for Computational Studies of Intelligence, AI 2001. Proceedings (Lecture Notes in Artificial Intelligence Vol.2056), P88
[6]   SEQUENCING JOBS ON AN AUTOMOBILE ASSEMBLY-LINE - OBJECTIVES AND PROCEDURES [J].
BOLAT, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (05) :1219-1236
[7]   Fixed response thresholds and the regulation of division of labor in insect societies [J].
Bonabeau, E ;
Theraulaz, G ;
Deneubourg, JL .
BULLETIN OF MATHEMATICAL BIOLOGY, 1998, 60 (04) :753-807
[8]  
Boysen N., BUR BUSINES IN PRESS
[9]   Assembly line balancing: Which model to use when? [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :509-528
[10]   Level scheduling under limited resequencing flexibility [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2010, 22 (3-4) :236-257