Distribution System Planning With Reliability

被引:131
作者
Lotero, Roberto C. [1 ]
Contreras, Javier [2 ]
机构
[1] State Univ Western Parana, Dept Elect Engn, BR-85870900 Foz Do Iguacu, Brazil
[2] Univ Castilla La Mancha, ETS Ingenieros Ind, E-13071 Ciudad Real, Spain
关键词
Customer interruption cost; economic analysis; power distribution planning; regulation; reliability; MULTISTAGE MODEL; GENERATION; ALGORITHM; COST;
D O I
10.1109/TPWRD.2011.2167990
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a model for solving the multistage planning problem of a distribution network. The objective function to be minimized is the net present value of the investment cost to add, reinforce or replace feeders and substations, losses cost, and operation and maintenance cost. The model considers three levels of load in each node and two investment alternatives for each resource to be added, reinforced or replaced. The nonlinear objective function is approximated by a piecewise linear function, resulting in a mixed integer linear model that is solved using standard mathematical programming. The model allows us to find multiple solutions in addition to the optimal one, helping the decision maker to analyze and choose from a pool of solutions. In addition to the optimization problem, reliability indexes and associated costs are computed for each solution, based on the regulation model used in Brazil. Numerical results and discussion are presented for an illustrative 27-node test network.
引用
收藏
页码:2552 / 2562
页数:11
相关论文
共 33 条
[21]   Power distribution planning: A review of models and issues [J].
Khator, SK ;
Leung, LC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (03) :1151-1158
[22]  
Lavorato M, 2009, IEEE POW ENER SOC GE, P1010
[23]  
Makinen A., 1988, 1988 IEEE International Symposium on Circuits and Systems. Proceedings (Cat. No.88CH2458-8), P1631, DOI 10.1109/ISCAS.1988.15246
[24]  
Norwegian Water Resources and Energy Directorate (NVE), 2009, REP REG EL MARK
[25]   A MODIFIED DYNAMIC-PROGRAMMING ALGORITHM FOR SIZING, LOCATING AND TIMING OF FEEDER REINFORCEMENTS [J].
PARTANEN, J .
IEEE TRANSACTIONS ON POWER DELIVERY, 1990, 5 (01) :277-283
[26]   Power distribution system planning with reliability modeling and optimization [J].
Tang, YF .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :181-187
[27]   DISTRIBUTION-SYSTEM EXPANSION PLANNING-MODELS - AN OVERVIEW [J].
TEMRAZ, HK ;
QUINTANA, VH .
ELECTRIC POWER SYSTEMS RESEARCH, 1993, 26 (01) :61-70
[28]   Value-based distributed generator placements for service quality improvements [J].
Teng, Jen-Hao ;
Liu, Yi-Hwa ;
Chen, Chia-Yen ;
Chen, Chi-Fa .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2007, 29 (03) :268-274
[29]   CUSTOMER COST OF ELECTRIC SERVICE INTERRUPTIONS [J].
WACKER, G ;
BILLINTON, R .
PROCEEDINGS OF THE IEEE, 1989, 77 (06) :919-930
[30]  
Wallnerstrom C. J., 2008, THESIS KTH ROYAL I T