Data-Driven Optimal Battery Storage Sizing for Grid-Connected Hybrid Distributed Generations Considering Solar and Wind Uncertainty

被引:13
作者
Rauf, Abdul [1 ,2 ]
Kassas, Mahmoud [1 ,2 ]
Khalid, Muhammad [1 ,2 ,3 ]
机构
[1] King Fahd Univ Petr & Minerals, Elect Engn Dept, Dhahran 31261, Saudi Arabia
[2] King Fahd Univ Petr & Minerals, Ctr Renewable Energy & Power Syst, Dhahran 31261, Saudi Arabia
[3] SDAIA KFUPM Joint Res Ctr Artificial Intelligence, Dhahran 31261, Saudi Arabia
关键词
unit commitment; battery energy storage systems; wind-farm uncertainty; distributionally robust optimization; solar pv uncertainty; distributed generators; CONSTRAINED UNIT COMMITMENT; ENERGY; OPTIMIZATION; SYSTEMS; OPERATION; POWER; STATION; IMPACT; PROFIT;
D O I
10.3390/su141711002
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A large-scale renewable-based sustainable power system requires multifaced techno-economic optimization and energy penetration. Due to the volatile and non-periodic nature of renewable energy, the uncertainty of renewables combined with load uncertainties significantly impacts the operational efficiency of renewable integration. The complexities in balancing demand, generation, and maintaining system reliability have introduced new challenges in the current distribution system. Most of the associated challenges can be effectively reduced by using a battery energy storage system (BESS) and the right techniques for handling uncertainties. In this paper, a distributionally robust optimization (DRO) technique with a linear decision rule is formulated for the unit commitment (UC) framework for optimal scheduling of a distribution network that consists of a wind farm, solar PV, a distributed generator (DG), and BESS. To cut the energy cost per unit, BESS plays an important role by storing energy at an off-peak time for on-peak-time use with relatively lower prices. For the all-time minimum overall systems cost, the distribution system requires an optimal size of the BESS to be connected to provide optimal scheduling of DGs. Three case studies are formulated using an IEEE 14 bus system (converted from MW to kW to match the BESS size available in the market) and solved with the proposed distributionally robust optimization technique to achieve the maximum operating point with an optimal capacity of BESS, i.e., wind, solar and hybrid. Each case study has its own optimal 30-min interval schedule for DGs along with the optimal capacity of BESS. The cost comparison with and without BESS and its impact on the start-up and shut down of DGs is reported with all the dynamic economic dispatch results, including the battery's state-of-charge profile. The proposed technique can handle the uncertainties in renewables and allows economical energy dispatch and optimal BESS sizing with comparatively lower computational processing and complexities.
引用
收藏
页数:27
相关论文
共 53 条
[41]   Unit Commitment for Systems With Significant Wind Penetration [J].
Tuohy, Aidan ;
Meibom, Peter ;
Denny, Eleanor ;
O'Malley, Mark .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (02) :592-601
[42]   Robust design of off-grid solar-powered charging station for hydrogen and electric vehicles via robust optimization approach [J].
Wang, Yun ;
Kazemi, Milad ;
Nojavan, Sayyad ;
Jermsittiparsert, Kittisak .
INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2020, 45 (38) :18995-19006
[43]   Wasserstein and multivariate linear affine based distributionally robust optimization for CCHP-P2G scheduling considering multiple uncertainties [J].
Wang, Yuwei ;
Yang, Yuanjuan ;
Fei, Haoran ;
Song, Minghao ;
Jia, Mengyao .
APPLIED ENERGY, 2022, 306
[44]   Graph Computing Based Security Constrained Unit Commitment in Hydro-thermal Power Systems Incorporating Pumped Hydro Storage [J].
Wei, Longfei ;
Liu, Guangyi ;
Yan, Shen ;
Dai, Renchang ;
Tang, Yachen .
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2021, 7 (03) :485-496
[45]   A Distributionally Robust Optimization Model for Unit Commitment Considering Uncertain Wind Power Generation [J].
Xiong, Peng ;
Jirutitijaroen, Panida ;
Singh, Chanan .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (01) :39-49
[46]   A Comprehensive Review of Security-constrained Unit Commitment [J].
Yang, Nan ;
Dong, Zhenqiang ;
Wu, Lei ;
Zhang, Lei ;
Shen, Xun ;
Chen, Daojun ;
Zhu, Binxin ;
Liu, Yikui .
JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2022, 10 (03) :562-576
[47]   Conditional value at risk-based stochastic unit commitment considering the uncertainty of wind power generation [J].
Zhang, Yao ;
Wang, Jianxue ;
Ding, Tao ;
Wang, Xifan .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (02) :482-489
[48]   Profit-Maximizing Planning and Control of Battery Energy Storage Systems for Primary Frequency Control [J].
Zhang, Ying Jun ;
Zhao, Changhong ;
Tang, Wanrong ;
Low, Steven H. .
IEEE TRANSACTIONS ON SMART GRID, 2018, 9 (02) :712-723
[49]   Optimal placement of battery energy storage in distribution networks considering conservation voltage reduction and stochastic load composition [J].
Zhang, Yongxi ;
Ren, Shuyun ;
Dong, Zhao Yang ;
Xu, Yan ;
Meng, Ke ;
Zheng, Yu .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2017, 11 (15) :3862-3870
[50]   A data-enhanced distributionally robust optimization method for economic dispatch of integrated electricity and natural gas systems with wind uncertainty [J].
Zhao, Baining ;
Qian, Tong ;
Tang, Wenhu ;
Liang, Qiheng .
ENERGY, 2022, 243