Data-Driven Optimal Battery Storage Sizing for Grid-Connected Hybrid Distributed Generations Considering Solar and Wind Uncertainty

被引:13
作者
Rauf, Abdul [1 ,2 ]
Kassas, Mahmoud [1 ,2 ]
Khalid, Muhammad [1 ,2 ,3 ]
机构
[1] King Fahd Univ Petr & Minerals, Elect Engn Dept, Dhahran 31261, Saudi Arabia
[2] King Fahd Univ Petr & Minerals, Ctr Renewable Energy & Power Syst, Dhahran 31261, Saudi Arabia
[3] SDAIA KFUPM Joint Res Ctr Artificial Intelligence, Dhahran 31261, Saudi Arabia
关键词
unit commitment; battery energy storage systems; wind-farm uncertainty; distributionally robust optimization; solar pv uncertainty; distributed generators; CONSTRAINED UNIT COMMITMENT; ENERGY; OPTIMIZATION; SYSTEMS; OPERATION; POWER; STATION; IMPACT; PROFIT;
D O I
10.3390/su141711002
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A large-scale renewable-based sustainable power system requires multifaced techno-economic optimization and energy penetration. Due to the volatile and non-periodic nature of renewable energy, the uncertainty of renewables combined with load uncertainties significantly impacts the operational efficiency of renewable integration. The complexities in balancing demand, generation, and maintaining system reliability have introduced new challenges in the current distribution system. Most of the associated challenges can be effectively reduced by using a battery energy storage system (BESS) and the right techniques for handling uncertainties. In this paper, a distributionally robust optimization (DRO) technique with a linear decision rule is formulated for the unit commitment (UC) framework for optimal scheduling of a distribution network that consists of a wind farm, solar PV, a distributed generator (DG), and BESS. To cut the energy cost per unit, BESS plays an important role by storing energy at an off-peak time for on-peak-time use with relatively lower prices. For the all-time minimum overall systems cost, the distribution system requires an optimal size of the BESS to be connected to provide optimal scheduling of DGs. Three case studies are formulated using an IEEE 14 bus system (converted from MW to kW to match the BESS size available in the market) and solved with the proposed distributionally robust optimization technique to achieve the maximum operating point with an optimal capacity of BESS, i.e., wind, solar and hybrid. Each case study has its own optimal 30-min interval schedule for DGs along with the optimal capacity of BESS. The cost comparison with and without BESS and its impact on the start-up and shut down of DGs is reported with all the dynamic economic dispatch results, including the battery's state-of-charge profile. The proposed technique can handle the uncertainties in renewables and allows economical energy dispatch and optimal BESS sizing with comparatively lower computational processing and complexities.
引用
收藏
页数:27
相关论文
共 53 条
[1]   Optimal Sizing of Battery Energy Storage for a Grid-Connected Microgrid Subjected to Wind Uncertainties [J].
Abdulgalil, Mohammed Atta ;
Khalid, Muhammad ;
Alismail, Fahad .
ENERGIES, 2019, 12 (12)
[2]   Optimal stochastic bilevel scheduling of pumped hydro storage systems in a pay-as-bid energy market environment [J].
Akbari-Dibavar A. ;
Mohammadi-Ivatloo B. ;
Zare K. .
Journal of Energy Storage, 2020, 31
[3]   Impact of wind speed modelling on the predictive reliability assessment of wind-based microgrids [J].
Al-Muhaini, Mohammad ;
Bizrah, Asad ;
Heydt, Gerald ;
Khalid, Muhammad .
IET RENEWABLE POWER GENERATION, 2019, 13 (15) :2947-2956
[4]   Stochastic Optimal Planning of Battery Energy Storage Systems for Isolated Microgrids [J].
Alharbi, Hisham ;
Bhattacharya, Kankar .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2018, 9 (01) :211-227
[5]   Optimal Coordinated Planning of Energy Storage and Tie-Lines to Boost Flexibility with High Wind Power Integration [J].
Alismail, Fahad ;
Abdulgalil, Mohamed A. ;
Khalid, Muhammad .
SUSTAINABILITY, 2021, 13 (05) :1-17
[6]  
[Anonymous], GEN ELECT ENERGY STO
[7]  
[Anonymous], DATA HOURLY AGGREGAT
[8]  
Christie R., 1962, IEEE 14 BUS SYSTEM D
[9]  
Croce A.I., 2020, Transportation Research Procedia, V47, P211, DOI DOI 10.1016/J.TRPRO.2020.03.091
[10]   Impact of wind power on sizing and allocation of reserve requirements [J].
De Vos, Kristof ;
Morbee, Joris ;
Driesen, Johan ;
Belmans, Ronnie .
IET RENEWABLE POWER GENERATION, 2013, 7 (01) :1-9