Constructability study on a German reference IGCC power plant with and without CO2-capture for hard coal and lignite

被引:54
作者
Graebner, Martin [1 ]
von Morstein, Olaf [2 ]
Rappold, Dorit [3 ]
Guenster, Werner [4 ]
Beysel, Gerhard [5 ]
Meyer, Bernd [1 ]
机构
[1] Tech Univ Bergakad Freiberg, Dept Energy Proc Engn & Chem Engn, D-09596 Freiberg, Germany
[2] Uhde GmbH, D-44141 Dortmund, Germany
[3] Lurgi GmbH, D-60295 Frankfurt, Germany
[4] Siemens AG, D-91058 Erlangen, Germany
[5] Linde AG, D-82049 Hollriegelskreuth, Germany
关键词
IGCC integrated gasification combined cycle; CO2; separation; CCS carbon capture and sequestration; CARBON-DIOXIDE CAPTURE; CO2; CAPTURE; GASIFICATION;
D O I
10.1016/j.enconman.2010.03.011
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper describes several cases of technical design, performance and an economic evaluation for IGCC-power plant concepts with and without CO2 capture and storage (CCS) operated on world market hard coal and German lignite. Evaluations include IGCC concepts based on commercially available and competitive state-of-the-art technologies. In concept pre-assessment pressure concepts for heat recovery steam generation, configuration of air separation unit, gas conditioning alternatives and synthesis gas cooling in comparison to full water quench options for gas cooling were investigated. The economically most beneficial and efficient cases were evaluated identifying target values for carbon capture rate and plant efficiency. These requirements lead to the application of a HP/IP heat recovery system in gasification, a HP/IP/LP system in combined cycle, 70% air integration, sour CO shift conversion for hard coal and lignite cases with CCS and a full water quench in case for hard coal with CCS. The comparison between capture and non-capture cases shows a potential CO2-avoidance of 89% in case of hard coal and 74% in case of lignite, respectively. The additional auxiliary consumption due to CCS leads to a decreasing net efficiencies based on LHV basis from 45.9% to 34.9% (hard coal) and from 51.5% to 41.3% (lignite). In case of hard coal the cost of electricity increases by 13.4% with the addition of carbon capture and in case of lignite by 11.8%, respectively. A sensitivity analysis for different factors affecting relative cost of electricity was carried out as well. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2179 / 2187
页数:9
相关论文
共 19 条
  • [1] The impact of fossil generation advances on the emissions of CO2 in the United States
    Armor, AF
    Preston, GT
    [J]. ENERGY CONVERSION AND MANAGEMENT, 1996, 37 (6-8) : 671 - 677
  • [2] Casero P., 2007, 2 INT FREIB C IGCC X
  • [3] Cohen A., 2009, ELECT J, V22, P25
  • [4] A comparison of electricity and hydrogen production systems with CO2 capture and storage.: Part A:: Review and selection of promising conversion and capture technologies
    Damen, K
    van Troost, M
    Faaij, A
    Turkenburg, W
    [J]. PROGRESS IN ENERGY AND COMBUSTION SCIENCE, 2006, 32 (02) : 215 - 246
  • [5] Efficiency of an Integrated Gasification Combined Cycle (IGCC) power plant including CO2 removal
    Descamps, C.
    Bouallou, C.
    Kanniche, M.
    [J]. ENERGY, 2008, 33 (06) : 874 - 881
  • [6] Dowd RA., 2000, WABASH RIVER COAL GA
  • [7] Techno-Economic Evaluations and Benchmarking of Pre-combustion CO2 Capture and Oxy-fuel Processes Developed in the European ENCAP Project
    Ekstrom, Clas
    Schwendig, Frank
    Biede, Ole
    Franco, Flavio
    Haupt, Guenther
    de Koeijer, Gelein
    Papapavlou, Charalambos
    Rokke, Petter E.
    [J]. GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01): : 4233 - 4240
  • [8] Pre-combustion, post-combustion and oxy-combustion in thermal power plant for CO2 capture
    Kanniche, Mohamed
    Gros-Bonnivard, Rene
    Jaud, Philippe
    Valle-Marcos, Jose
    Amann, Jean-Marc
    Bouallou, Chakib
    [J]. APPLIED THERMAL ENGINEERING, 2010, 30 (01) : 53 - 62
  • [9] McDaniel J., 2002, TAMPA ELECT POLK POW, p1
  • [10] Coal gasification for advanced power generation
    Minchener, AJ
    [J]. FUEL, 2005, 84 (17) : 2222 - 2235