A hybrid decision-making approach based on FCM and MOORA for occupational health and safety risk analysis

被引:77
作者
Dabbagh, Rahim [1 ]
Yousefi, Samuel [1 ]
机构
[1] Urmia Univ Technol, Fac Ind Engn, Orumiyeh, Iran
关键词
Risk assessment; Occupational health and safety; Failure mode and effect analysis; Fuzzy cognitive map; Multi-objective optimization on the basis of ratio analysis; FUZZY COGNITIVE MAPS; FAILURE MODE; CONSTRUCTION; FMEA; AHP; PRIORITIZATION; OPTIMIZATION; INDUSTRY; HAZARDS;
D O I
10.1016/j.jsr.2019.09.021
中图分类号
TB18 [人体工程学];
学科分类号
1201 ;
摘要
Introduction: With the development of industries and increased diversity of their associated hazards, the importance of identifying these hazards and controlling the Occupational Health and Safety (OHS) risks has also dramatically augmented. Currently, there is a serious need for a risk management system to identify and prioritize risks with the aim of providing corrective preventive measures to minimize the negative consequences of OHS risks. In fact, this system can help the protection of employees' health and reduction of organizational costs. Method: The present study proposes a hybrid decision-making approach based on the Failure Mode and Effect Analysis (FMEA), Fuzzy Cognitive Map (FCM), and Multi-Objective Optimization on the basis of Ratio Analysis (MOORA) for assessing and prioritizing OHS risks. After identifying the risks and determining the values of the risk assessment criteria via the FMEA technique, the attempt is made to determine the weights of criteria based on their causal relationships through FCM and the hybrid learning algorithm. Then, the risk prioritization is carried out using the MOORA method based on the decision matrix (the output of the FMEA) and the weights of the criteria (the output of the FCM). Results: The results from the implementation of the proposed approach in a manufacturing company reveal that the score at issue can overcome some of the drawbacks of the traditional Risk Priority Number (RPN) in the conventional FMEA, including lack of assignment the different relative importance to the assessment criteria, inability to take into account other important management criteria, lack of consideration of causal relationships among criteria, and high dependence of the prioritization on the experts' opinions, which finally provides a full and distinct risk prioritization. (C) 2019 National Safety Council and Elsevier Ltd. All rights reserved.
引用
收藏
页码:111 / 123
页数:13
相关论文
共 42 条
[21]   Failure Mode and Effect Analysis Using Cloud Model Theory and PROMETHEE Method [J].
Liu, Hu-Chen ;
Li, Zhaojun ;
Song, Wenyan ;
Su, Qiang .
IEEE TRANSACTIONS ON RELIABILITY, 2017, 66 (04) :1058-1072
[22]   Risk evaluation approaches in failure mode and effects analysis: A literature review [J].
Liu, Hu-Chen ;
Liu, Long ;
Liu, Nan .
EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (02) :828-838
[23]   Risk evaluation in failure mode and effects analysis with extended VIKOR method under fuzzy environment [J].
Liu, Hu-Chen ;
Liu, Long ;
Liu, Nan ;
Mao, Ling-Xiang .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (17) :12926-12934
[24]   Human error identification and risk prioritization in overhead crane operations using HTA, SHERPA and fuzzy VIKOR method [J].
Mandal, Saptarshi ;
Singh, Karmveer ;
Behera, R. K. ;
Sahu, S. K. ;
Raj, Navneet ;
Maiti, J. .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (20) :7195-7206
[25]   Analyzing organizational project alternatives for agile manufacturing processes: an analytical network approach [J].
Meade, LM ;
Sarkis, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (02) :241-261
[26]   Assessing occupational risks in pipeline construction using FMEA-based AHP-MOORA integrated approach under Pythagorean fuzzy environment [J].
Mete, Suleyman .
HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2019, 25 (07) :1645-1660
[27]   A proposed occupational health and safety risk estimation tool for manufacturing systems [J].
Moatari-Kazerouni, Afrooz ;
Chinniah, Yuvin ;
Agard, Bruno .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (15) :4459-4475
[28]   Assessment of occupational hazards and associated risks in fuzzy environment: A case study of a university chemical laboratory [J].
Ozdemir, Yasal ;
Gul, Muhammet ;
Celik, Erkan .
HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2017, 23 (04) :895-924
[29]   A participatory approach to ecosystem conservation:: Fuzzy cognitive maps and stakeholder group analysis in Uluabat Lake, Turkey [J].
Özesmi, U ;
Özesmi, S .
ENVIRONMENTAL MANAGEMENT, 2003, 31 (04) :518-531
[30]   Active Hebbian learning algorithm to train fuzzy cognitive maps [J].
Papageorgiou, EI ;
Stylios, CD ;
Groumpos, PP .
INTERNATIONAL JOURNAL OF APPROXIMATE REASONING, 2004, 37 (03) :219-249