Progress and challenges of the ITER TBM Program from the IO perspective

被引:27
作者
Giancarli, L. M. [1 ]
Barabash, V. [1 ]
Campbell, D. J. [1 ]
Chiocchio, S. [1 ]
Cordiera, J. J. [1 ]
Dammann, A. [1 ]
Dell'Orco, G. [1 ]
Elbez-Uzan, J. [1 ]
Fourneron, J. M. [1 ]
Friconneau, J. P. [1 ]
Gasparotto, M. [2 ]
Iseli, M. [1 ]
Jung, C. -Y. [1 ]
Kim, B. -Y. [1 ]
Lazarov, D. [1 ]
Levesy, B. [1 ]
Loughlin, M. [1 ]
Merola, M. [1 ]
Neviere, J. -C. [3 ]
Pascal, R. [1 ]
Ring, W. [1 ]
Schneiderova, I. [4 ]
Willms, S. [1 ]
Siarras, A. [1 ]
Shu, W. [1 ]
Snipes, J. A. [1 ]
van der Laan, J. G. [1 ]
机构
[1] ITER Org, Route Vinon Sur Verdon,CS 90 046, F-13067 St Paul Les Durance, France
[2] Max Planck Inst Plasma Phys, Wendelsteinstr 1, D-17491 Greifswald, Germany
[3] Comex Nucl, F-13115 St Paul Les Durance, France
[4] Sogeti High Tech, F-13857 Aix En Provence, France
关键词
Breeding blanket; TBM; ITER; DEMO; RESEARCH-AND-DEVELOPMENT; TEST BLANKET SYSTEMS; DESIGN; MODULE;
D O I
10.1016/j.fusengdes.2015.11.046
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The paper describes the organization of the Test Blanket Module (TBM) program, its overall objective and schedule and the status of the technical activities within the ITER Organization-Central Team (IO-CT). The latter include the design integration of the Test Blanket Systems (TBSs) into the nuclear buildings, ensuring all interfaces with other ITER systems, the design of the common TBS components such as the TBM Frames, the Dummy TBMs, and the TBS maintenance tools and equipment in the TBM Port Cell as well as in the Hot Cell building, the design of the TBS connection pipes and the definition of the required maintenance operations and associated R&D. The paper also discusses the major challenges that the TBM Program will be facing in ITER such as the potential impact of the TBMs ferriticimartensitic structures on plasma operations, the approaches to tritium and contamination confinement, the required mitigation and recovery actions in case of accidents, and the assessment of the reliability aspects that could have an impact on ITER availability. (C) 2016 ITER Organization. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:1491 / 1497
页数:7
相关论文
共 14 条
  • [1] Progress in engineering design of Indian LLCB TBM set for testing in ITER
    Chaudhuri, Paritosh
    Ranjithkumar, S.
    Sharma, Deepak
    Danani, Chandan
    Swami, H. L.
    Bhattacharya, R.
    Patel, Anita
    Kumar, E. Rajendra
    Vyas, K. N.
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1362 - 1369
  • [2] Design and R&D progress of Korean HCCR TBM
    Cho, Seungyon
    Ahn, Mu-Young
    Lee, Dong Won
    Park, Yi-Hyun
    Lee, Eo Hwak
    Jin, Hyung Gon
    Lee, Cheol Woo
    Kim, Tae Kyu
    Chun, Young-Bum
    Kim, Suk Kwon
    Yoon, Jae Sung
    Yun, Young-Hoon
    Jung, Yang Il
    Lee, Young-Min
    Shin, Kyu In
    Ku, Duck Young
    Park, Soon Chang
    Kim, Chang-Shuk
    Min, Kyungmi
    Jeong, Yong Hwan
    Lee, Young Ouk
    Jung, Kijung
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1137 - 1143
  • [3] R&D status on Water Cooled Ceramic Breeder Blanket Technology
    Enoeda, Mikio
    Tanigawa, Hisashi
    Hirose, Takanori
    Nakajima, Motoki
    Sato, Satoshi
    Ochiai, Kentaro
    Konno, Chikara
    Kawamura, Yoshinori
    Hayashi, Takumi
    Yamanishi, Toshihiko
    Hoshino, Tsuyoshi
    Nakamichi, Masaru
    Tanigawa, Hiroyasu
    Nishi, Hiroshi
    Suzuki, Satoshi
    Ezato, Koichiro
    Seki, Yohji
    Yokoyama, Kenji
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1131 - 1136
  • [4] New progress on design and R&D for solid breeder test blanket module in China
    Feng, K. M.
    Zhang, G. S.
    Hu, G.
    Chen, Y. J.
    Feng, Y. J.
    Li, Z. X.
    Wang, P. H.
    Zhao, Z.
    Ye, X. F.
    Xiang, B.
    Zhang, L.
    Wang, Q. J.
    Cao, Q. X.
    Zhao, F. C.
    Wang, F.
    Liu, Y.
    Zhang, M. C.
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1119 - 1125
  • [5] Breeding blanket modules testing in ITER:: An international program on the way to DEMO
    Giancarli, L
    Chuyanov, V
    Abdou, A
    Akiba, M
    Hong, BG
    Lässer, R
    Pan, C
    Strebkov, Y
    [J]. FUSION ENGINEERING AND DESIGN, 2006, 81 (1-7) : 393 - 405
  • [6] Tritium and heat management in ITER Test Blanket Systems port cell for maintenance operations
    Giancarli, L. M.
    Cortes, P.
    Iseli, M.
    Lepetit, L.
    Levesy, B.
    Livingston, D.
    Neviere, J. C.
    Pascal, R.
    Ricapito, I.
    Shu, W.
    Wyse, S.
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (9-10) : 2088 - 2092
  • [7] Overview of the ITER TBM Program
    Giancarli, L. M.
    Abdou, M.
    Campbell, D. J.
    Chuyanov, V. A.
    Ahn, M. Y.
    Enoeda, M.
    Pan, C.
    Poitevin, Y.
    Kumar, E. Rajendra
    Ricapito, I.
    Strebkov, Y.
    Suzuki, S.
    Wong, P. C.
    Zmitko, M.
    [J]. FUSION ENGINEERING AND DESIGN, 2012, 87 (5-6) : 395 - 402
  • [8] Kim B.Y., 2015, P ISFNT 12 JEJ ISL K
  • [9] Lanctot M.J., 2014, NCUL FUSION UNPUB
  • [10] Main maintenance operations for Test Blanket Systems in ITER TBM port cells
    Pascal, R.
    Cortes, P.
    Friconneau, J. -P.
    Giancarli, L. M.
    Gotewal, K. K.
    Iseli, M.
    Kim, B. Y.
    Levesy, B.
    Martins, J. -P.
    Merola, M.
    Neviere, J. -C.
    Patisson, L.
    Siarras, A.
    Tesini, A.
    [J]. FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 2417 - 2421