Optimization of A2O BNR processes using ASM and EAWAG Bio-P models: model formulation

被引:5
作者
El Shorbagy, Walid [1 ]
Nabil, Nawras
Droste, Ronald L. [2 ]
机构
[1] United Arab Emirates Univ, Dept Civil & Environm Engn, Al Ain, U Arab Emirates
[2] Univ Ottawa, Dept Civil Engn, Ottawa, ON K1N 6N5, Canada
来源
WATER QUALITY RESEARCH JOURNAL OF CANADA | 2011年 / 46卷 / 01期
关键词
A(2)O; BNR; BPR; modelling; optimization; WWTP; ACTIVATED-SLUDGE SYSTEMS; STEADY-STATE MODEL; PRIMARY SEDIMENTATION; PHOSPHORUS REMOVAL; NITRIFICATION; CALIBRATION; PREDICTION; VALIDATION; EFFICIENCY;
D O I
10.2166/wqrjc.2011.005
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
This study is an extended and comprehensive analysis to accomplish optimal sizing for a biological nutrient removal (BNR) system with an A(2)O BNR activated sludge process using activated sludge models (ASM) kinetic models. A highly nonlinear activated sludge model combined with the EAWAG Bio-P module is formulated and optimized using a generalized reduced gradient solver. Primary and final clarifications are included with the A(2)O biotreatment scheme along with oxygen-supplying units. This paper includes a detailed description of model formulation, problem definition and discussion of optimal design in terms of capital (CAPEX) and operating (OPEX) cost estimates. The optimization problem is formulated and solved using typical cost factors and operating/design constraints applied to a typical illustrative system treating medium-strength wastewater. Results indicated that maintenance and sludge disposal expenditures represent more than 50% of the total annual cost and 80% of the annual running operating cost. Another major finding was that a primary clarifier is found to be cost ineffective in the A(2)O BNR process. Sensitivity of the optimal solutions and model performance to varying inflow conditions and to other effluent limits and model parameters will be discussed in another paper.
引用
收藏
页码:13 / 27
页数:15
相关论文
共 22 条
[1]  
[Anonymous], 1991, WAST ENG TREATM DISP
[2]   Dynamic optimisation of small size wastewater treatment plants including nitrification and denitrification processes [J].
Chachuat, B ;
Roche, N ;
Latifi, MA .
COMPUTERS & CHEMICAL ENGINEERING, 2001, 25 (4-6) :585-593
[3]   Steady state analysis of the coupling aerator and secondary settling tank in activated sludge process [J].
Cho, SH ;
Chang, HN ;
Prost, C .
WATER RESEARCH, 1996, 30 (11) :2601-2608
[4]   An empirical model for primary sedimentation of sewage [J].
Christoulas, DG ;
Yannakopoulos, PH ;
Andreadakis, AD .
ENVIRONMENT INTERNATIONAL, 1998, 24 (08) :925-934
[5]  
Drud A.S., 1996, CONOPT: a system for large scale nonlinear optimization, Reference manual for COPOPT subroutine library
[6]  
*GAMS DEV CORP, 2007, GAMS SOFTW 2006
[7]  
Grady Jr CPL, 2011, Biological Wastewater Treatment, VThird
[8]  
Henze M., 2006, Activated Sludge Models ASM1, ASM2, ASM2d and ASM3
[9]  
Jeppsson U., 1996, Modeling aspects of wastewater treatment processes
[10]  
JIANG F, 2005, 2005011 GEORG WAT PL