Fabrication processes for the PEP-II RF cavities

被引:0
作者
Franks, RM [1 ]
Rimmer, RA [1 ]
Schwarz, H [1 ]
机构
[1] Univ Calif Lawrence Livermore Natl Lab, Livermore, CA 94551 USA
来源
PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS | 1998年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents the major steps used in the fabrication of the 26 RF Cavities required for the PEP-II. B-factory. Several unique applications of conventional processes have been developed and successfully implemented: electron beam welding (EBW), with minimal porosity, of .75 inch (19 mm) copper cross-sections; extensive 5-axis milling of water channels; electroplating of .37 inch (10 mm) thick OFE copper; tuning of the cavity by profiling beam noses prior to final joining with the cavity body; and machining of the cavity interior, are described here.
引用
收藏
页码:3007 / 3009
页数:3
相关论文
共 5 条
[1]  
*ASTM, F6882 ASTM
[2]  
FRANKS RM, 1997, P 1997 AWS CONV LOS, P184
[3]  
HELLER A, UCRL520009712, P4
[4]  
RIMMER RA, 1994, P EPAC 94 JUN 27 JUL
[5]  
RIMMER RA, 1995, P PAC95 DALL TEX MAY